Go to AgTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
Residue Management

Operation and Component Calculation View

Operations NPV Calculator

Introduction
This tool calculates net present value totals for operation and component uris. The discounted totals include operating, allocated overhead, capital, and incentive-adjusted totals. Operations or components that have an effective life different than 1 period include annual totals. Resource stock analyzers use the scheduling and timeliness parameters for labor and capital stock planning.

Calculation View Description
v171a

Version: 1.7.0

Feedback About crops/operationgroup/Residue Management/270/operation

Step 1 of 3. Make Selections


Step 2 of 3. Calculate

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions (beta)

Step 1

  • Step 1. Real and Nominal Rates: The nominal rate includes inflation while the real rate does not. In the USA, DevTreks recommends using Office of Management and Budget rates for the same year as the date of the input.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 3. Overwrite Descendants?: True to insert or update all of the attributes of this same calculator in all children. False only updates children attributes that are controlled by the developer of this calculator (i.e. version, stylehsheet name, relatedcalculatorstype ...)
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: When the Use Same Calculator Pack in Descendant is true, uses this value to determine which descendant calculator to update. Inserts a new descendant when no descendant has this same name. Updates the descendant that has this same name.
  • Step 2. Alternative Type: This property is used to analyze differences between Alternatives.
  • Step 2. Target Type: This property is used to analyze progress being achieved with budget goals.
  • Step 2. Calculated Results: Please refer to the references below.

References

  • Hallam, Eidman, Morehart and Klonsky (editors) Commodity Cost and Returns Estimation Handbook, Staff General Research Papers, Iowa State University, Department of Economics, 1999

Current view of document
DevTreks -social budgeting that improves lives and livelihoods
Operation Group : Residue Management
Document Status : notreviewed
Description : These corn and soybean operations are used in an Ag Production Analysis 1 tutorial.
Label : 1.4.5 Operation Type : 96
Is Price List? : False
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Residue Management, mulch till, chisel plow (8/12/1900 12:00:00 AM)
12/31/2003 1.4.5.1 NRCS 329B 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0650
Description needs description
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 12.15 12.15 0.26
Total Allocated Overhead Costs 7.64 7.64 0.25
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 19.79 19.79 0.51
Total Costs - Operation w. Incentives 19.79 19.79
Inputs
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Residue Management, mulch till, field cultivate (8/12/1900 12:00:00 AM)
12/31/2003 1.4.5.3 NRCS 329B 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0650
Description needs description
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 7.93 7.93 0.12
Total Allocated Overhead Costs 4.21 4.21 0.10
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 12.14 12.14 0.22
Total Costs - Operation w. Incentives 12.14 12.14
Inputs
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Residue Management, mulch till, corn after beans, field cultivate (8/12/1900 12:00:00 AM)
12/31/2003 1.4.5.4 NRCS 329B 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0650
Description needs description
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 4.70 4.70 0.05
Total Allocated Overhead Costs 2.74 2.74 0.03
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 7.44 7.44 0.08
Total Costs - Operation w. Incentives 7.44 7.44
Inputs
Operation
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
Residue Management, mulch till, disk (8/12/1900 12:00:00 AM)
12/31/2004 1.4.5.2 NRCS 329B 1 1 0.0000 0.0000 0
Operation Unit:acre ResourceWeight 1 Rates (R and N) 0.0200  0.0650
Description needs description
Total Costs - Operation Total Cost Annual Cost Interest Portion
Total Operating Costs 6.83 6.83 0.29
Total Allocated Overhead Costs 4.37 4.37 0.18
Total Capital Costs 0.00 0.00 0.00
Total Costs - Operation 11.20 11.20 0.47
Total Costs - Operation w. Incentives 11.20 11.20
Inputs
Dataset: Residue Management IRI These corn and soybean operations are used in an Ag Production Analysis 1 tutorial.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.