Earned Value Management Examples

Life Cycle Stock Analyzer Views

EVM Totals Analysis

Introduction
This tool generates a variety of basic life cycle stock statistics for DevTreks capital budgets and operating budgets.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v196a

Version: 1.7.0

Feedback About commercial/budgetgroup/Earned Value Management Examples/2140761974/budgetlcatotal1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to either operating budgets or capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Earned Value Management Examples

Budget Group : Earned Value Management Examples

Benefit Details

Total Revenue : 4663000.00
Total LCB : 4663000.00
Total EAA : 0.00
Total Unit : 4663000.00
SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 4.663
SubBen 1 Unit : mile
SubBen 1 Price : 3,000,000.00
SubBen 1 Total : 2,331,500.00
SubBen 1 Unit Cost : 2,331,500.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 4.663
SubBen 2 Unit : mile
SubBen 2 Price : 3,000,000.00
SubBen 2 Total : 2,331,500.00
SubBen 2 Unit Cost : 2,331,500.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Cost Details

Total OC : 5602.50
Total AOH : 138.85
Total CAP : 0.00
Total LCC : 5741.35
Total EAA : 0.00
Total Unit : 5741.35
SubCost 1 Name : Material
SubCost 1 Amount : 13.500
SubCost 1 Unit : mile
SubCost 1 Price : 4,900.00
SubCost 1 Total : 4,725.00
SubCost 1 Unit Cost : 4,725.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 6.750
SubCost 2 Unit : hour
SubCost 2 Price : 455.00
SubCost 2 Total : 438.75
SubCost 2 Unit Cost : 438.75
SubCost 2 Description : Sample subcost used in an EVM analysis.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 20.250
SubCost 3 Unit : hour
SubCost 3 Price : 1,137,955.00
SubCost 3 Total : 577.60
SubCost 3 Unit Cost : 577.60
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01

Budget : EVM 01 Planned Budget

Benefit Details

Total Revenue : 4000000.00
Total LCB : 4000000.00
Total EAA : 0.00
Total Unit : 4000000.00
SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 4.000
SubBen 1 Unit : mile
SubBen 1 Price : 2,000,000.00
SubBen 1 Total : 2,000,000.00
SubBen 1 Unit Cost : 2,000,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 4.000
SubBen 2 Unit : mile
SubBen 2 Price : 2,000,000.00
SubBen 2 Total : 2,000,000.00
SubBen 2 Unit Cost : 2,000,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Cost Details

Total OC : 3320.00
Total AOH : 82.28
Total CAP : 0.00
Total LCC : 3402.28
Total EAA : 0.00
Total Unit : 3402.28
SubCost 1 Name : Material
SubCost 1 Amount : 8.000
SubCost 1 Unit : mile
SubCost 1 Price : 2,800.00
SubCost 1 Total : 2,800.00
SubCost 1 Unit Cost : 2,800.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 4.000
SubCost 2 Unit : hour
SubCost 2 Price : 260.00
SubCost 2 Total : 260.00
SubCost 2 Unit Cost : 260.00
SubCost 2 Description : Sample subcost used in an EVM analysis.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 12.000
SubCost 3 Unit : hour
SubCost 3 Price : 650,260.00
SubCost 3 Total : 342.28
SubCost 3 Unit Cost : 342.28
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01

Time Period : 2013 Planned Time Period

Outcomes
Operations

Budget : EVM 02 Actual Budget

Benefit Details

Total Revenue : 663000.00
Total LCB : 663000.00
Total EAA : 0.00
Total Unit : 663000.00
SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 0.663
SubBen 1 Unit : mile
SubBen 1 Price : 1,000,000.00
SubBen 1 Total : 331,500.00
SubBen 1 Unit Cost : 331,500.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 0.663
SubBen 2 Unit : mile
SubBen 2 Price : 1,000,000.00
SubBen 2 Total : 331,500.00
SubBen 2 Unit Cost : 331,500.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Cost Details

Total OC : 2282.50
Total AOH : 56.57
Total CAP : 0.00
Total LCC : 2339.07
Total EAA : 0.00
Total Unit : 2339.07
SubCost 1 Name : Material
SubCost 1 Amount : 5.500
SubCost 1 Unit : mile
SubCost 1 Price : 2,100.00
SubCost 1 Total : 1,925.00
SubCost 1 Unit Cost : 1,925.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 2.750
SubCost 2 Unit : hour
SubCost 2 Price : 195.00
SubCost 2 Total : 178.75
SubCost 2 Unit Cost : 178.75
SubCost 2 Description : Sample subcost used in an EVM analysis.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 8.250
SubCost 3 Unit : hour
SubCost 3 Price : 487,695.00
SubCost 3 Total : 235.32
SubCost 3 Unit Cost : 235.32
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01

Time Period : 2013 Actual Time Period

Outcomes
Operations
Dataset: Earned Value Management Examples IRI Sample data set used in a DevTreks Earned Value Management Tutorial.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.