Earned Value Management Examples

Life Cycle Cost Calculation View

Totals Analysis

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks components and operations.

Calculation View Description
Sample analysis used in an EVM tutorial. v214a

Version: 1.7.0

Feedback About commercial/componentgroup/Earned Value Management Examples/658/componentlcatotal1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Earned Value Management Examples

Component Group : Earned Value Management Examples

Component Details

Total OC : 2700450.00
Total AOH : 900150.00
Total CAP : 2400400.00
Total LCC : 6001000.00
Total EAA : 0.00
Total Unit : 6001000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 6.001
SubCost 1 Unit : mile
SubCost 1 Price : 700,000.00
SubCost 1 Total : 600,100.00
SubCost 1 Unit Cost : 600,100.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 12.002
SubCost 2 Unit : mile
SubCost 2 Price : 3,150,000.00
SubCost 2 Total : 2,700,450.00
SubCost 2 Unit Cost : 2,700,450.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 6.001
SubCost 3 Unit : mile
SubCost 3 Price : 1,050,000.00
SubCost 3 Total : 900,150.00
SubCost 3 Unit Cost : 900,150.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 6.001
SubCost 4 Unit :
SubCost 4 Price : 2,100,000.00
SubCost 4 Total : 1,800,300.00
SubCost 4 Unit Cost : 1,800,300.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q1 RR Track Actual(Amount: 1.000; Date: 03/31/2013

Component Details

Total OC : 300150.00
Total AOH : 100050.00
Total CAP : 266800.00
Total LCC : 667000.00
Total EAA : 0.00
Total Unit : 667000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 0.667
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 66,700.00
SubCost 1 Unit Cost : 66,700.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 1.334
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 300,150.00
SubCost 2 Unit Cost : 300,150.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 0.667
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 100,050.00
SubCost 3 Unit Cost : 100,050.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 0.667
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 200,100.00
SubCost 4 Unit Cost : 200,100.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q1 RR Track Planned(Amount: 1.000; Date: 03/31/2013

Component Details

Total OC : 450000.00
Total AOH : 150000.00
Total CAP : 400000.00
Total LCC : 1000000.00
Total EAA : 0.00
Total Unit : 1000000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 1.000
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 100,000.00
SubCost 1 Unit Cost : 100,000.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 2.000
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 450,000.00
SubCost 2 Unit Cost : 450,000.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1.000
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 150,000.00
SubCost 3 Unit Cost : 150,000.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 1.000
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 300,000.00
SubCost 4 Unit Cost : 300,000.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q2 RR Track Actual(Amount: 1.000; Date: 06/30/2013

Component Details

Total OC : 300150.00
Total AOH : 100050.00
Total CAP : 266800.00
Total LCC : 667000.00
Total EAA : 0.00
Total Unit : 667000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 0.667
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 66,700.00
SubCost 1 Unit Cost : 66,700.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 1.334
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 300,150.00
SubCost 2 Unit Cost : 300,150.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 0.667
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 100,050.00
SubCost 3 Unit Cost : 100,050.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 0.667
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 200,100.00
SubCost 4 Unit Cost : 200,100.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q2 RR Track Planned(Amount: 1.000; Date: 06/30/2013

Component Details

Total OC : 450000.00
Total AOH : 150000.00
Total CAP : 400000.00
Total LCC : 1000000.00
Total EAA : 0.00
Total Unit : 1000000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 1.000
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 100,000.00
SubCost 1 Unit Cost : 100,000.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 2.000
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 450,000.00
SubCost 2 Unit Cost : 450,000.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1.000
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 150,000.00
SubCost 3 Unit Cost : 150,000.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 1.000
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 300,000.00
SubCost 4 Unit Cost : 300,000.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q3 RR Track Actual(Amount: 1.000; Date: 09/30/2013

Component Details

Total OC : 300150.00
Total AOH : 100050.00
Total CAP : 266800.00
Total LCC : 667000.00
Total EAA : 0.00
Total Unit : 667000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 0.667
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 66,700.00
SubCost 1 Unit Cost : 66,700.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 1.334
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 300,150.00
SubCost 2 Unit Cost : 300,150.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 0.667
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 100,050.00
SubCost 3 Unit Cost : 100,050.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 0.667
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 200,100.00
SubCost 4 Unit Cost : 200,100.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q3 RR Track Planned(Amount: 1.000; Date: 09/30/2013

Component Details

Total OC : 450000.00
Total AOH : 150000.00
Total CAP : 400000.00
Total LCC : 1000000.00
Total EAA : 0.00
Total Unit : 1000000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 1.000
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 100,000.00
SubCost 1 Unit Cost : 100,000.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 2.000
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 450,000.00
SubCost 2 Unit Cost : 450,000.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1.000
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 150,000.00
SubCost 3 Unit Cost : 150,000.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 1.000
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 300,000.00
SubCost 4 Unit Cost : 300,000.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01

Component : 2013, Q4 RR Track Planned(Amount: 1.000; Date: 12/31/2013

Component Details

Total OC : 450000.00
Total AOH : 150000.00
Total CAP : 400000.00
Total LCC : 1000000.00
Total EAA : 0.00
Total Unit : 1000000.00
SubCost 1 Name : Materials
SubCost 1 Amount : 1.000
SubCost 1 Unit : mile
SubCost 1 Price : 100,000.00
SubCost 1 Total : 100,000.00
SubCost 1 Unit Cost : 100,000.00
SubCost 1 Description : EVM tutorial example.
SubCost 1 Label : m01
SubCost 2 Name : Labor
SubCost 2 Amount : 2.000
SubCost 2 Unit : mile
SubCost 2 Price : 450,000.00
SubCost 2 Total : 450,000.00
SubCost 2 Unit Cost : 450,000.00
SubCost 2 Description : EVM tutorial.
SubCost 2 Label : l01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1.000
SubCost 3 Unit : mile
SubCost 3 Price : 150,000.00
SubCost 3 Total : 150,000.00
SubCost 3 Unit Cost : 150,000.00
SubCost 3 Description : EVM tutorial example.
SubCost 3 Label : e01
SubCost 4 Name : Land
SubCost 4 Amount : 1.000
SubCost 4 Unit :
SubCost 4 Price : 300,000.00
SubCost 4 Total : 300,000.00
SubCost 4 Unit Cost : 300,000.00
SubCost 4 Description : EVM tutorial.
SubCost 4 Label : re01
Dataset: Earned Value Management Examples IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.