Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
Life Cycle Cost Analysis Example 01

Life Cycle Cost Calculation View

Change by Year Analysis

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks components and operations.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v214a

Version: 1.7.0

Feedback About commercial/componentgroup/Life Cycle Cost Analysis Example 01/657/componentlcachangeyr

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Life Cycle Cost Analysis Example 01

Component Group: Life Cycle Cost Analysis Example 01 ; A10

Component Name, Date, Label

Alt0: 2007 Example 01 Slab on Grade
Alt1: 2008 Example 01 Slab on Grade
Alt2: 2009 Example 01 Slab on Grade
Alt0: 12/31/2007
Alt1: 12/31/2008
Alt2: 12/31/2009

Component Details

Cost Observations

Alt0: 2
Alt1: 2
Alt2: 2

Alternative

Alt0:
Alt1:
Alt2:

OC Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

CAP Total

Alt0: 93,217.70
Alt1: 64,429.15
Alt2: 23,244.88

CAP AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: -41,184.28

CAP PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: -63.92

CAP BaseChange

Alt0: 0.00
Alt1: -28,788.55
Alt2: -69,972.83

CAP BasePercentChange

Alt0: 0.00
Alt1: -30.88
Alt2: -75.06

LCC Total

Alt0: 93,217.70
Alt1: 64,429.15
Alt2: 23,244.88

LCC AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: -41,184.28

LCC PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: -63.92

LCC BaseChange

Alt0: 0.00
Alt1: -28,788.55
Alt2: -69,972.83

LCC BasePercentChange

Alt0: 0.00
Alt1: -30.88
Alt2: -75.06

EAA Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

EAA AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

EAA PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

EAA BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

EAA BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

Unit Total

Alt0: 5,575.03
Alt1: 5,485.40
Alt2: 2,774.19

Unit AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: -2,711.21

Unit PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: -49.43

Unit BaseChange

Alt0: 0.00
Alt1: -89.63
Alt2: -2,800.84

Unit BasePercentChange

Alt0: 0.00
Alt1: -1.61
Alt2: -50.24

SubCosts

SubCost 1 Name

Alt0: Material
Alt1: Material
Alt2: Material

SubCost 1 Amount

Alt0: 8,570.000
Alt1: 8,319.000
Alt2: 4,102.500

SubCost 1 Unit

Alt0: CY
Alt1: CY
Alt2: CY

SubCost 1 Price

Alt0: 852.94
Alt1: 868.28
Alt2: 893.94

SubCost 1 Total

Alt0: 50,732.00
Alt1: 28,199.00
Alt2: 10,104.73

SubCost 1 Total Per Unit

Alt0: 3,223.36
Alt1: 3,256.87
Alt2: 1,686.78

SubCost 2 Name

Alt0: Labor
Alt1: Labor
Alt2: Labor

SubCost 2 Amount

Alt0: 10,479.000
Alt1: 10,305.000
Alt2: 5,105.000

SubCost 2 Unit

Alt0: CY
Alt1: CY
Alt2: CY

SubCost 2 Price

Alt0: 455.08
Alt1: 432.50
Alt2: 447.52

SubCost 2 Total

Alt0: 41,012.40
Alt1: 34,653.05
Alt2: 12,543.45

SubCost 2 Total Per Unit

Alt0: 2,350.20
Alt1: 2,226.96
Alt2: 1,086.82

SubCost 3 Name

Alt0: Equipment
Alt1: Equipment
Alt2: Equipment

SubCost 3 Amount

Alt0: 2,220.000
Alt1: 2,205.000
Alt2: 1,080.000

SubCost 3 Unit

Alt0: CY
Alt1: CY
Alt2: CY

SubCost 3 Price

Alt0: 12.25
Alt1: 13.26
Alt2: 13.28

SubCost 3 Total

Alt0: 1,431.30
Alt1: 1,535.10
Alt2: 581.70

SubCost 3 Total Per Unit

Alt0: 1.43
Alt1: 1.54
Alt2: 0.58

SubCost 4 Name

Alt0: Global Warming Potential
Alt1: Global Warming Potential
Alt2: Global Warming Potential

SubCost 4 Amount

Alt0: 2,100.000
Alt1: 2,100.000
Alt2: 750.000

SubCost 4 Unit

Alt0: kg CO2 equivs
Alt1: kg CO2 equivs
Alt2: kg CO2 equivs

SubCost 4 Price

Alt0: 0.04
Alt1: 0.04
Alt2: 0.04

SubCost 4 Total

Alt0: 42.00
Alt1: 42.00
Alt2: 15.00

SubCost 4 Total Per Unit

Alt0: 0.04
Alt1: 0.04
Alt2: 0.02

SubCost 5 Name

Alt0: Habitat Alteration Potential
Alt1: Habitat Alteration Potential
Alt2: Habitat Alteration Potential

SubCost 5 Amount

Alt0: 2.100
Alt1: 2.100
Alt2: 0.750

SubCost 5 Unit

Alt0: TE Species Count equivs
Alt1: TE Species Count equivs
Alt2: TE Species Count equivs

SubCost 5 Price

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

SubCost 5 Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

SubCost 5 Total Per Unit

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Dataset: Life Cycle Cost Analysis Example 01 IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.