Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
Life Cycle Cost Analysis Example 01

Life Cycle Cost Calculation View

Totals Analysis

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks components and operations.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v210a

Version: 1.7.0

Feedback About commercial/componentgroup/Life Cycle Cost Analysis Example 01/657/componentlcatotal1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Life Cycle Cost Analysis Example 01

Component Group : Life Cycle Cost Analysis Example 01

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 180891.73
Total LCC : 180891.73
Total EAA : 0.00
Total Unit : 13834.62
SubCost 1 Name : Material
SubCost 1 Amount : 20,991.500
SubCost 1 Unit : CY
SubCost 1 Price : 2,615.16
SubCost 1 Total : 89,035.73
SubCost 1 Unit Cost : 8,167.00
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 25,889.000
SubCost 2 Unit : CY
SubCost 2 Price : 1,335.10
SubCost 2 Total : 88,208.90
SubCost 2 Unit Cost : 5,663.98
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 5,505.000
SubCost 3 Unit : CY
SubCost 3 Price : 38.79
SubCost 3 Total : 3,548.10
SubCost 3 Unit Cost : 3.55
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 4,950.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.12
SubCost 4 Total : 99.00
SubCost 4 Unit Cost : 0.10
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 4.950
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01

Component : 2007 Example 01 Slab on Grade(Amount: 1.000; Date: 12/31/2007

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 56967.00
Total LCC : 56967.00
Total EAA : 0.00
Total Unit : 2784.24
SubCost 1 Name : Material
SubCost 1 Amount : 4,305.000
SubCost 1 Unit : CY
SubCost 1 Price : 426.47
SubCost 1 Total : 36,525.00
SubCost 1 Unit Cost : 1,614.95
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 5,205.000
SubCost 2 Unit : CY
SubCost 2 Price : 227.54
SubCost 2 Total : 19,737.00
SubCost 2 Unit Cost : 1,168.59
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1,100.000
SubCost 3 Unit : CY
SubCost 3 Price : 6.13
SubCost 3 Total : 685.00
SubCost 3 Unit Cost : 0.69
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 1,000.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.02
SubCost 4 Total : 20.00
SubCost 4 Unit Cost : 0.02
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 1.000
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01

Component : 2007 Example 02 Slab on Grade(Amount: 1.000; Date: 12/31/2007

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 36250.70
Total LCC : 36250.70
Total EAA : 0.00
Total Unit : 2790.79
SubCost 1 Name : Material
SubCost 1 Amount : 4,265.000
SubCost 1 Unit : CY
SubCost 1 Price : 426.47
SubCost 1 Total : 14,207.00
SubCost 1 Unit Cost : 1,608.41
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 5,274.000
SubCost 2 Unit : CY
SubCost 2 Price : 227.54
SubCost 2 Total : 21,275.40
SubCost 2 Unit Cost : 1,181.61
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1,120.000
SubCost 3 Unit : CY
SubCost 3 Price : 6.13
SubCost 3 Total : 746.30
SubCost 3 Unit Cost : 0.75
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 1,100.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.02
SubCost 4 Total : 22.00
SubCost 4 Unit Cost : 0.02
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 1.100
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01

Component : 2008 Example 01 Slab on Grade(Amount: 1.000; Date: 12/31/2008

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 30538.79
Total LCC : 30538.79
Total EAA : 0.00
Total Unit : 2720.65
SubCost 1 Name : Material
SubCost 1 Amount : 4,087.000
SubCost 1 Unit : CY
SubCost 1 Price : 434.14
SubCost 1 Total : 13,851.90
SubCost 1 Unit Cost : 1,616.05
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 5,071.000
SubCost 2 Unit : CY
SubCost 2 Price : 216.25
SubCost 2 Total : 15,885.44
SubCost 2 Unit Cost : 1,103.80
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1,097.000
SubCost 3 Unit : CY
SubCost 3 Price : 6.63
SubCost 3 Total : 780.05
SubCost 3 Unit Cost : 0.78
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 1,070.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.02
SubCost 4 Total : 21.40
SubCost 4 Unit Cost : 0.02
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 1.070
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01

Component : 2008 Example 02 Slab on Grade(Amount: 1.000; Date: 12/31/2008

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 33890.36
Total LCC : 33890.36
Total EAA : 0.00
Total Unit : 2764.76
SubCost 1 Name : Material
SubCost 1 Amount : 4,232.000
SubCost 1 Unit : CY
SubCost 1 Price : 434.14
SubCost 1 Total : 14,347.10
SubCost 1 Unit Cost : 1,640.82
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 5,234.000
SubCost 2 Unit : CY
SubCost 2 Price : 216.25
SubCost 2 Total : 18,767.61
SubCost 2 Unit Cost : 1,123.16
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1,108.000
SubCost 3 Unit : CY
SubCost 3 Price : 6.63
SubCost 3 Total : 755.05
SubCost 3 Unit Cost : 0.76
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 1,030.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.02
SubCost 4 Total : 20.60
SubCost 4 Unit Cost : 0.02
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 1.030
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01

Component : 2009 Example 01 Slab on Grade(Amount: 1.000; Date: 12/31/2009

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 0.00
Total LCC : 0.00
Total EAA : 0.00
Total Unit : 0.00
SubCost 1 Name : Material
SubCost 1 Amount : 0.000
SubCost 1 Unit : CY
SubCost 1 Price : 446.97
SubCost 1 Total : 0.00
SubCost 1 Unit Cost : 0.00
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 0.000
SubCost 2 Unit : CY
SubCost 2 Price : 223.76
SubCost 2 Total : 0.00
SubCost 2 Unit Cost : 0.00
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 0.000
SubCost 3 Unit : CY
SubCost 3 Price : 6.64
SubCost 3 Total : 0.00
SubCost 3 Unit Cost : 0.00
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 0.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.02
SubCost 4 Total : 0.00
SubCost 4 Unit Cost : 0.00
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 0.000
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01

Component : 2009 Example 02 Slab on Grade(Amount: 1.000; Date: 12/31/2009

Component Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 23244.88
Total LCC : 23244.88
Total EAA : 0.00
Total Unit : 2774.19
SubCost 1 Name : Material
SubCost 1 Amount : 4,102.500
SubCost 1 Unit : CY
SubCost 1 Price : 446.97
SubCost 1 Total : 10,104.73
SubCost 1 Unit Cost : 1,686.78
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 5,105.000
SubCost 2 Unit : CY
SubCost 2 Price : 223.76
SubCost 2 Total : 12,543.45
SubCost 2 Unit Cost : 1,086.82
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
SubCost 3 Name : Equipment
SubCost 3 Amount : 1,080.000
SubCost 3 Unit : CY
SubCost 3 Price : 6.64
SubCost 3 Total : 581.70
SubCost 3 Unit Cost : 0.58
SubCost 3 Description : This cost derives from ...
SubCost 3 Label : equip01
SubCost 4 Name : Global Warming Potential
SubCost 4 Amount : 750.000
SubCost 4 Unit : kg CO2 equivs
SubCost 4 Price : 0.02
SubCost 4 Total : 15.00
SubCost 4 Unit Cost : 0.02
SubCost 4 Description :
SubCost 4 Label : carbon01
SubCost 5 Name : Habitat Alteration Potential
SubCost 5 Amount : 0.750
SubCost 5 Unit : TE Species Count equivs
SubCost 5 Price : 0.00
SubCost 5 Total : 0.00
SubCost 5 Unit Cost : 0.00
SubCost 5 Description :
SubCost 5 Label : habitat01
Dataset: Life Cycle Cost Analysis Example 01 IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.