Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
Life Cycle Cost Analysis Example 01

Net Present Value Cost Calculation View

Change

Introduction
This tool generates a variety of basic net present value statistics for DevTreks components and operations.

Calculation View Description
v210a

Version: 1.7.0

Feedback About commercial/componentgroup/Life Cycle Cost Analysis Example 01/657/componentnpvchangeyr

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions (beta)

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Life Cycle Cost Analysis Example 01

Component Group: Life Cycle Cost Analysis Example 01 ; A10

Component Name, Date, Label

Alt0: 2007 Example 01 Slab on Grade
Alt1: 2008 Example 01 Slab on Grade
Alt2: 2009 Example 01 Slab on Grade
Alt0: 12/31/2007
Alt1: 12/31/2008
Alt2: 12/31/2009

Component Details

Cost Observations

Alt0: 2
Alt1: 2
Alt2: 2

Alternative

Alt0: A
Alt1: A
Alt2: A

OC Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

OC BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

AOH BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00

CAP Total

Alt0: 95,971.06
Alt1: 66,336.60
Alt2: 23,931.02

CAP AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: -42,405.58

CAP PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: -63.92

CAP BaseChange

Alt0: 0.00
Alt1: -29,634.46
Alt2: -72,040.04

CAP BasePercentChange

Alt0: 0.00
Alt1: -30.88
Alt2: -75.06

Total Total

Alt0: 95,971.06
Alt1: 66,336.60
Alt2: 23,931.02

Total AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: -42,405.58

Total PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: -63.92

Total BaseChange

Alt0: 0.00
Alt1: -29,634.46
Alt2: -72,040.04

Total BasePercentChange

Alt0: 0.00
Alt1: -30.88
Alt2: -75.06

Incent Total

Alt0: 95,971.06
Alt1: 66,336.60
Alt2: 23,931.02

Incent AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: -42,405.58

Incent PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: -63.92

Incent BaseChange

Alt0: 0.00
Alt1: -29,634.46
Alt2: -72,040.04

Incent BasePercentChange

Alt0: 0.00
Alt1: -30.88
Alt2: -75.06
Dataset: Life Cycle Cost Analysis Example 01 IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.