NPS 2011, Concrete Waste Factor 10 Percent

Life Cycle Cost Calculation View

Change by Alternative

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks inputs.

Calculation View Description
v210a

Version: 1.7.0

Feedback About commercial/input/NPS 2011, Concrete Waste Factor 10 Percent/2147397457/inputlcachangealt

Step 1 of 3. Make Selections


Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Choose the one option offered in this version of the analyzer.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviation is not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Alternative: Used for comparisons.
  • Step 2. Target Type: Used for progress analysis and to set benchmarks and actuals.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying LCA calculator after inserting, deleting, or updating, this linked view (that keeps the LCA calculator's linked views synchronized with these linkedviews).


Current view of document
NPS 2011, Concrete Waste Factor 10 Percent

Input Group: A1030 SLAB ON GRADE ; A1030

Input Name and Label

Alt0: NPS 2011, Concrete Waste Factor 10 Percent
Alt0: 03.30.53

Input Series Name and Label

Alt0: NPS 2007, Concrete Waste Factor 10 Percent
Alt1: NPS 2008, Concrete Waste Factor 10 Percent
Alt2: NPS 2009, Concrete Waste Factor 10 Percent
Alt3: NPS 2010, Concrete Waste Factor 10 Percent
Alt4: NPS 2011, Concrete Waste Factor 10 Percent
Alt0: 03.30.53
Alt1: 03.30.53
Alt2: 03.30.53
Alt3: 03.30.53
Alt4: 03.30.53

Input Series Details

Observations

Alt0: 1
Alt1: 1
Alt2: 1
Alt3: 1
Alt4: 1

Alternative

Alt0: A
Alt1: B
Alt2: C
Alt3: D
Alt4: E

OC Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

OC AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

OC PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

OC BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

OC BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

AOH Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

AOH AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

AOH PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

AOH BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

AOH BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

CAP Total

Alt0: 235.30
Alt1: 237.30
Alt2: 240.30
Alt3: 242.30
Alt4: 248.30

CAP AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 3.00
Alt3: 2.00
Alt4: 6.00

CAP PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 1.26
Alt3: 0.83
Alt4: 2.48

CAP BaseChange

Alt0: 0.00
Alt1: 2.00
Alt2: 5.00
Alt3: 7.00
Alt4: 13.00

CAP BasePercentChange

Alt0: 0.00
Alt1: 0.85
Alt2: 2.12
Alt3: 2.97
Alt4: 5.52

LCC Total

Alt0: 235.30
Alt1: 237.30
Alt2: 240.30
Alt3: 242.30
Alt4: 248.30

LCC AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 3.00
Alt3: 2.00
Alt4: 6.00

LCC PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 1.26
Alt3: 0.83
Alt4: 2.48

LCC BaseChange

Alt0: 0.00
Alt1: 2.00
Alt2: 5.00
Alt3: 7.00
Alt4: 13.00

LCC BasePercentChange

Alt0: 0.00
Alt1: 0.85
Alt2: 2.12
Alt3: 2.97
Alt4: 5.52

EAA Total

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

EAA AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

EAA PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

EAA BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

EAA BasePercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.00

Unit Total

Alt0: 0.24
Alt1: 0.24
Alt2: 0.24
Alt3: 0.24
Alt4: 0.25

Unit AmountChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.00
Alt3: 0.00
Alt4: 0.01

Unit PercentChange

Alt0: 0.00
Alt1: 0.00
Alt2: 1.26
Alt3: 0.83
Alt4: 2.48

Unit BaseChange

Alt0: 0.00
Alt1: 0.00
Alt2: 0.01
Alt3: 0.01
Alt4: 0.01

Unit BasePercentChange

Alt0: 0.00
Alt1: 0.85
Alt2: 2.12
Alt3: 2.97
Alt4: 5.52

SubCosts

SubCost 1 Name

Alt0: Material
Alt1: Material
Alt2: Material
Alt3: Material
Alt4: Material

SubCost 1 Amount

Alt0: 1.000
Alt1: 1.000
Alt2: 1.000
Alt3: 1.000
Alt4: 1.000

SubCost 1 Unit

Alt0: each
Alt1: each
Alt2: each
Alt3: each
Alt4: each

SubCost 1 Price

Alt0: 235.30
Alt1: 237.30
Alt2: 240.30
Alt3: 242.30
Alt4: 248.30

SubCost 1 Total

Alt0: 235.30
Alt1: 237.30
Alt2: 240.30
Alt3: 242.30
Alt4: 248.30

SubCost 1 Total Per Unit

Alt0: 0.24
Alt1: 0.24
Alt2: 0.24
Alt3: 0.24
Alt4: 0.25
Dataset: NPS 2011, Concrete Waste Factor 10 Percent IRI This building construction cost estimate is computed using life cycle cycle input calculators and totals, statistics, incremental change, and progress analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.