NPS 2011, Concrete Waste Factor 10 Percent

Life Cycle Cost Calculation View

Change by Id

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks inputs.

Calculation View Description
v171a

Version: 1.7.0

Feedback About commercial/input/NPS 2011, Concrete Waste Factor 10 Percent/2147397457/none

Step 1 of 3. Make Selections


Step 2 of 3. Analyze

Relations

Use In Descendants?
Overwrite Descendants?
Compare Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Method 2. Do you wish to save the analysis as comma-separated, column-row, text? This format is amenable to further analysis in standard statistical packages. The text can be downloaded by packaging and downloading this uri.

Instructions (beta)

Step 1

  • Step 1. Base Calculations To Analyze: Choose the one option offered in this version of the analyzer.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviation is not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Alternative: Used for comparisons.
  • Step 2. Target Type: Used for progress analysis and to set benchmarks and actuals.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying LCA calculator after inserting, deleting, or updating, this linked view (that keeps the LCA calculator's linked views synchronized with these linkedviews).


Current view of document
NPS 2011, Concrete Waste Factor 10 Percent

Input Group : A1030 SLAB ON GRADE

Input : NPS 2011, Concrete Waste Factor 10 Percent

Input Details

Date : 01/10/2013
Observations : 1; Alternative :
OC Total : 0.00
OC Amount Change : 0.00
OC Percent Change : 0.00
OC Base Change : 0.00
OC Base Percent Change : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 1,203.50
CAP AmountChange : 0.00
CAP PercentChange : 0.00
CAP BaseChange : 0.00
CAP BasePercentChange : 0.00
LCC Total : 1,203.50
LCC AmountChange : 0.00
LCC PercentChange : 0.00
LCC BaseChange : 0.00
LCC BasePercentChange : 0.00
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 1.20
Unit AmountChange : 0.00
Unit PercentChange : 0.00
Unit BaseChange : 0.00
Unit BasePercentChange : 0.00

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 5.000
SubCost 1 Unit : each
SubCost 1 Price : 1,203.50
SubCost 1 Total : 1,203.50
SubCost 1 Unit Cost : 1.20
SubCost 1 Description : U.S. National Park Service example.v139a
SubCost 1 Label : mater01

Input Series : NPS 2007, Concrete Waste Factor 10 Percent

Input Details

Date : 01/10/2007
Observations : 1; Alternative : A
OC Total : 0.00
OC Amount Change : 0.00
OC Percent Change : 0.00
OC Base Change : 0.00
OC Base Percent Change : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 235.30
CAP AmountChange : 0.00
CAP PercentChange : 0.00
CAP BaseChange : 0.00
CAP BasePercentChange : 0.00
LCC Total : 235.30
LCC AmountChange : 0.00
LCC PercentChange : 0.00
LCC BaseChange : 0.00
LCC BasePercentChange : 0.00
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 0.24
Unit AmountChange : 0.00
Unit PercentChange : 0.00
Unit BaseChange : 0.00
Unit BasePercentChange : 0.00

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 1.000
SubCost 1 Unit : each
SubCost 1 Price : 235.30
SubCost 1 Total : 235.30
SubCost 1 Unit Cost : 0.24
SubCost 1 Description : This subcost derives from ...
SubCost 1 Label : mater01

Input Series : NPS 2008, Concrete Waste Factor 10 Percent

Input Details

Date : 01/10/2008
Observations : 1; Alternative : B
OC Total : 0.00
OC Amount Change : 0.00
OC Percent Change : 0.00
OC Base Change : 0.00
OC Base Percent Change : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 237.30
CAP AmountChange : 0.00
CAP PercentChange : 0.00
CAP BaseChange : 2.00
CAP BasePercentChange : 0.85
LCC Total : 237.30
LCC AmountChange : 0.00
LCC PercentChange : 0.00
LCC BaseChange : 2.00
LCC BasePercentChange : 0.85
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 0.24
Unit AmountChange : 0.00
Unit PercentChange : 0.00
Unit BaseChange : 0.00
Unit BasePercentChange : 0.85

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 1.000
SubCost 1 Unit : each
SubCost 1 Price : 237.30
SubCost 1 Total : 237.30
SubCost 1 Unit Cost : 0.24
SubCost 1 Description : This subcost derives from ...
SubCost 1 Label : mater01

Input Series : NPS 2009, Concrete Waste Factor 10 Percent

Input Details

Date : 01/10/2009
Observations : 1; Alternative : C
OC Total : 0.00
OC Amount Change : 0.00
OC Percent Change : 0.00
OC Base Change : 0.00
OC Base Percent Change : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 240.30
CAP AmountChange : 3.00
CAP PercentChange : 1.26
CAP BaseChange : 5.00
CAP BasePercentChange : 2.12
LCC Total : 240.30
LCC AmountChange : 3.00
LCC PercentChange : 1.26
LCC BaseChange : 5.00
LCC BasePercentChange : 2.12
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 0.24
Unit AmountChange : 0.00
Unit PercentChange : 1.26
Unit BaseChange : 0.01
Unit BasePercentChange : 2.12

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 1.000
SubCost 1 Unit : each
SubCost 1 Price : 240.30
SubCost 1 Total : 240.30
SubCost 1 Unit Cost : 0.24
SubCost 1 Description : This subcost derives from ...
SubCost 1 Label : mater01

Input Series : NPS 2010, Concrete Waste Factor 10 Percent

Input Details

Date : 01/10/2010
Observations : 1; Alternative : D
OC Total : 0.00
OC Amount Change : 0.00
OC Percent Change : 0.00
OC Base Change : 0.00
OC Base Percent Change : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 242.30
CAP AmountChange : 2.00
CAP PercentChange : 0.83
CAP BaseChange : 7.00
CAP BasePercentChange : 2.97
LCC Total : 242.30
LCC AmountChange : 2.00
LCC PercentChange : 0.83
LCC BaseChange : 7.00
LCC BasePercentChange : 2.97
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 0.24
Unit AmountChange : 0.00
Unit PercentChange : 0.83
Unit BaseChange : 0.01
Unit BasePercentChange : 2.97

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 1.000
SubCost 1 Unit : each
SubCost 1 Price : 242.30
SubCost 1 Total : 242.30
SubCost 1 Unit Cost : 0.24
SubCost 1 Description : This subcost derives from ...
SubCost 1 Label : mater01

Input Series : NPS 2011, Concrete Waste Factor 10 Percent

Input Details

Date : 01/10/2011
Observations : 1; Alternative : E
OC Total : 0.00
OC Amount Change : 0.00
OC Percent Change : 0.00
OC Base Change : 0.00
OC Base Percent Change : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 248.30
CAP AmountChange : 6.00
CAP PercentChange : 2.48
CAP BaseChange : 13.00
CAP BasePercentChange : 5.52
LCC Total : 248.30
LCC AmountChange : 6.00
LCC PercentChange : 2.48
LCC BaseChange : 13.00
LCC BasePercentChange : 5.52
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 0.25
Unit AmountChange : 0.01
Unit PercentChange : 2.48
Unit BaseChange : 0.01
Unit BasePercentChange : 5.52

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 1.000
SubCost 1 Unit : each
SubCost 1 Price : 248.30
SubCost 1 Total : 248.30
SubCost 1 Unit Cost : 0.25
SubCost 1 Description : U.S. National Park Service example.v139a
SubCost 1 Label : mater01
Dataset: NPS 2011, Concrete Waste Factor 10 Percent IRI This building construction cost estimate is computed using life cycle cycle input calculators and totals, statistics, incremental change, and progress analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.