Get
Earned Value Management Examples

Operation and Component Calculation View

Operations NPV Calculator

Introduction
This tool calculates net present value totals for operation and component uris. The discounted totals include operating, allocated overhead, capital, and incentive-adjusted totals. Operations or components that have an effective life different than 1 period include annual totals. Resource stock analyzers use the scheduling and timeliness parameters for labor and capital stock planning.

Calculation View Description
v214a

Version: 1.7.0

Feedback About commercial/operationgroup/Earned Value Management Examples/755/operation

Step 1 of 3. Make Selections


Step 2 of 3. Calculate

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions (beta)

Step 1

  • Step 1. Real and Nominal Rates: The nominal rate includes inflation while the real rate does not. In the USA, DevTreks recommends using Office of Management and Budget rates for the same year as the date of the input.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 3. Overwrite Descendants?: True to insert or update all of the attributes of this same calculator in all children. False only updates children attributes that are controlled by the developer of this calculator (i.e. version, stylehsheet name, relatedcalculatorstype ...)
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: When the Use Same Calculator Pack in Descendant is true, uses this value to determine which descendant calculator to update. Inserts a new descendant when no descendant has this same name. Updates the descendant that has this same name.
  • Step 2. Alternative Type: This property is used to analyze differences between Alternatives.
  • Step 2. Target Type: This property is used to analyze progress being achieved with budget goals.
  • Step 2. Calculated Results: Please refer to the references below.

References

  • Hallam, Eidman, Morehart and Klonsky (editors) Commodity Cost and Returns Estimation Handbook, Staff General Research Papers, Iowa State University, Department of Economics, 1999

Current view of document
Earned Value Management Examples

Operation Group : Earned Value Management Examples

Operation Group Details

Document Status: 3
Description : This operation group is used to test life cycle earned value management analyses.
Type: 0
Label : OG125

Operation : 2013 Rail Road Maintenance, Q1 Actual

Operation Details

Last Changed : 11/7/2013 12:00:00 AM
Date : 03/30/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 1,247.97
Ann OC Cost : 1,247.97
Total OC Int : 2.97
Total AOH Cost : 30.93
Ann AOH Cost : 30.93
Total AOH Int : 0.07
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 1,278.90
Ann Cost : 1,278.90
Total Int : 3.04
Incent Cost : 1,278.90
Ann Incent Cost : 1,278.90

Operation : 2013 Rail Road Maintenance, Q1 Planned

Operation Details

Last Changed : 5/9/2013 12:00:00 AM
Date : 03/30/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 831.98
Ann OC Cost : 831.98
Total OC Int : 1.98
Total AOH Cost : 20.62
Ann AOH Cost : 20.62
Total AOH Int : 0.05
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 852.60
Ann Cost : 852.60
Total Int : 2.03
Incent Cost : 852.60
Ann Incent Cost : 852.60

Operation : 2013 Rail Road Maintenance, Q2 Actual

Operation Details

Last Changed : 11/7/2013 12:00:00 AM
Date : 06/30/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 623.98
Ann OC Cost : 623.98
Total OC Int : 1.48
Total AOH Cost : 15.46
Ann AOH Cost : 15.46
Total AOH Int : 0.04
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 639.44
Ann Cost : 639.44
Total Int : 1.52
Incent Cost : 639.45
Ann Incent Cost : 639.45

Operation : 2013 Rail Road Maintenance, Q2 Planned

Operation Details

Last Changed : 11/7/2013 12:00:00 AM
Date : 06/30/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 831.98
Ann OC Cost : 831.98
Total OC Int : 1.98
Total AOH Cost : 20.62
Ann AOH Cost : 20.62
Total AOH Int : 0.05
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 852.60
Ann Cost : 852.60
Total Int : 2.03
Incent Cost : 852.60
Ann Incent Cost : 852.60

Operation : 2013 Rail Road Maintenance, Q3 Actual

Operation Details

Last Changed : 11/7/2013 12:00:00 AM
Date : 09/30/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 415.99
Ann OC Cost : 415.99
Total OC Int : 0.99
Total AOH Cost : 10.31
Ann AOH Cost : 10.31
Total AOH Int : 0.02
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 426.30
Ann Cost : 426.30
Total Int : 1.01
Incent Cost : 426.30
Ann Incent Cost : 426.30

Operation : 2013 Rail Road Maintenance, Q3 Planned

Operation Details

Last Changed : 11/7/2013 12:00:00 AM
Date : 09/30/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 831.98
Ann OC Cost : 831.98
Total OC Int : 1.98
Total AOH Cost : 20.62
Ann AOH Cost : 20.62
Total AOH Int : 0.05
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 852.60
Ann Cost : 852.60
Total Int : 2.03
Incent Cost : 852.60
Ann Incent Cost : 852.60

Operation : 2013 Rail Road Maintenance, Q4 Planned

Operation Details

Last Changed : 11/7/2013 12:00:00 AM
Date : 12/31/2013
Amount : 1
Life : 1
Salvage : 0.0000
Unit : mile
IncentAmount : 0.0000
IncentRate : 0
Rates (R and N) : 0.0100  0.0300
Description : This operation is used to test Progress life cycle assessments.
Total OC Cost : 832.05
Ann OC Cost : 832.05
Total OC Int : 2.05
Total AOH Cost : 20.62
Ann AOH Cost : 20.62
Total AOH Int : 0.05
Total CAP Cost : 0.00
Ann CAP Cost : 0.00
Total CAP Int : 0.00
Total Cost : 852.67
Ann Cost : 852.67
Total Int : 2.10
Incent Cost : 852.67
Ann Incent Cost : 852.67
Dataset: Earned Value Management Examples IRI This operation group is used to test life cycle earned value management analyses.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.