Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
NPS Trailhead Life Cycle Cost Group

Life Cycle Cost Calculation View

Change by Alternative Analysis

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks components and operations.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v210a

Version: 1.7.0

Feedback About commercial/operationgroup/NPS Trailhead Life Cycle Cost Group/757/operationlcachangealt

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
NPS Trailhead Life Cycle Cost Group

Operation Group : NPS Trailhead Life Cycle Cost Group

Operation Details

Date : 09/28/2017
Observations : 1; Alternative :
OC Total : 4,517.00
OC AmountChange : 0.00
OC PercentChange : 0.00
OC BaseChange : 0.00
OC BasePercentChange : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 0.00
CAP AmountChange : 0.00
CAP PercentChange : 0.00
CAP BaseChange : 0.00
CAP BasePercentChange : 0.00
LCC Total : 4,517.00
LCC AmountChange : 0.00
LCC PercentChange : 0.00
LCC BaseChange : 0.00
LCC BasePercentChange : 0.00
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 4,517.00
Unit AmountChange : 0.00
Unit PercentChange : 0.00
Unit BaseChange : 0.00
Unit BasePercentChange : 0.00

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 103.500
SubCost 1 Unit : each
SubCost 1 Price : 128.00
SubCost 1 Total : 2,164.50
SubCost 1 Unit Cost : 2,164.50
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 103.500
SubCost 2 Unit : hour
SubCost 2 Price : 138.00
SubCost 2 Total : 2,352.50
SubCost 2 Unit Cost : 2,352.50
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01

Operation : 2007 Trailhead Improvement 01(Amount: 1.000; Date: 12/31/2007

Operation Details

Date : 12/31/2007
Observations : 3; Alternative : A
OC Total : 2,353.00
OC AmountChange : 0.00
OC PercentChange : 0.00
OC BaseChange : 0.00
OC BasePercentChange : 0.00
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 0.00
CAP AmountChange : 0.00
CAP PercentChange : 0.00
CAP BaseChange : 0.00
CAP BasePercentChange : 0.00
LCC Total : 2,353.00
LCC AmountChange : 0.00
LCC PercentChange : 0.00
LCC BaseChange : 0.00
LCC BasePercentChange : 0.00
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 2,353.00
Unit AmountChange : 0.00
Unit PercentChange : 0.00
Unit BaseChange : 0.00
Unit BasePercentChange : 0.00

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 54.000
SubCost 1 Unit : each
SubCost 1 Price : 64.00
SubCost 1 Total : 1,127.00
SubCost 1 Unit Cost : 1,127.00
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 54.000
SubCost 2 Unit : hour
SubCost 2 Price : 69.00
SubCost 2 Total : 1,226.00
SubCost 2 Unit Cost : 1,226.00
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01

Operation : 2007 Trailhead Improvement 02(Amount: 1.000; Date: 12/31/2007

Operation Details

Date : 12/31/2007
Observations : 3; Alternative : B
OC Total : 2,164.00
OC AmountChange : 0.00
OC PercentChange : 0.00
OC BaseChange : -189.00
OC BasePercentChange : -8.03
AOH Total : 0.00
AOH AmountChange : 0.00
AOH PercentChange : 0.00
AOH BaseChange : 0.00
AOH BasePercentChange : 0.00
CAP Total : 0.00
CAP AmountChange : 0.00
CAP PercentChange : 0.00
CAP BaseChange : 0.00
CAP BasePercentChange : 0.00
LCC Total : 2,164.00
LCC AmountChange : 0.00
LCC PercentChange : 0.00
LCC BaseChange : -189.00
LCC BasePercentChange : -8.03
EAA Total : 0.00
EAA AmountChange : 0.00
EAA PercentChange : 0.00
EAA BaseChange : 0.00
EAA BasePercentChange : 0.00
Unit Total : 2,164.00
Unit AmountChange : 0.00
Unit PercentChange : 0.00
Unit BaseChange : -189.00
Unit BasePercentChange : -8.03

SubCosts

SubCost 1 Name : Material
SubCost 1 Amount : 49.500
SubCost 1 Unit : each
SubCost 1 Price : 64.00
SubCost 1 Total : 1,037.50
SubCost 1 Unit Cost : 1,037.50
SubCost 1 Description : This cost derives from ...
SubCost 1 Label : mater01
SubCost 2 Name : Labor
SubCost 2 Amount : 49.500
SubCost 2 Unit : hour
SubCost 2 Price : 69.00
SubCost 2 Total : 1,126.50
SubCost 2 Unit Cost : 1,126.50
SubCost 2 Description : This cost derives from ...
SubCost 2 Label : labor01
Dataset: NPS Trailhead Life Cycle Cost Group IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress operation analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.