Earned Value Management Examples

Life Cycle Outcome Analyzer Views

EVM Analysis

Introduction
This tool generates a variety of life cycle output stock statistics for DevTreks outcomes.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v214a

Version: 1.7.0

Feedback About commercial/outcomegroup/Earned Value Management Examples/37/outcomelcaprogress1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to outcomes.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
Earned Value Management Examples

Outcome Group : Earned Value Management Examples

Outcome Details

Date : 08/07/2018
Observations : 1; Target Type :
R Planned Period : 996,000.00
R Plan Full : 0.00
R Plan Cumul : 0.00
R Actual Period : 0.00
R Actual Cumul : 0.00
R Actual Period Change : 0.00
R Actual Cumul Change : 0.00
R Planned Period Percent : 0.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
LCB Planned Period : 996,000.00
LCB Plan Full : 0.00
LCB Plan Cumul : 0.00
LCB Actual Period : 0.00
LCB Actual Cumul : 0.00
LCB Actual Period Change : 0.00
LCB Actual Cumul Change : 0.00
LCB Planned Period Percent : 0.00
LCB Planned Cumul Percent : 0.00
LCB Planned Full Percent : 0.00
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 996,000.00
RUnit Plan Full : 0.00
RUnit Plan Cumul : 0.00
RUnit Actual Period : 0.00
RUnit Actual Cumul : 0.00
RUnit Actual Period Change : 0.00
RUnit Actual Cumul Change : 0.00
RUnit Planned Period Percent : 0.00
RUnit Planned Cumul Percent : 0.00
RUnit Planned Full Percent : 0.00

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 0.996
SubBen 1 Unit : mile
SubBen 1 Price : 1,500,000.00
SubBen 1 Total : 498,000.00
SubBen 1 Unit Benefit : 498,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 0.996
SubBen 2 Unit : mile
SubBen 2 Price : 1,500,000.00
SubBen 2 Total : 498,000.00
SubBen 2 Unit Benefit : 498,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q1 RR Track Actual(Amount: 0.330; Date: 03/30/2013; Label: A1010

Outcome Details

Date : 03/30/2013
Observations : 1; Target Type : actual
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 1,000,000.00
R Actual Period : 330,000.00
R Actual Cumul : 330,000.00
R Actual Period Change : -670,000.00
R Actual Cumul Change : -670,000.00
R Planned Period Percent : 33.00
R Planned Cumul Percent : 33.00
R Planned Full Percent : 8.25
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 1,000,000.00
LCB Actual Period : 330,000.00
LCB Actual Cumul : 330,000.00
LCB Actual Period Change : -670,000.00
LCB Actual Cumul Change : -670,000.00
LCB Planned Period Percent : 33.00
LCB Planned Cumul Percent : 33.00
LCB Planned Full Percent : 8.25
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 1,000,000.00
RUnit Actual Period : 330,000.00
RUnit Actual Cumul : 330,000.00
RUnit Actual Period Change : -670,000.00
RUnit Actual Cumul Change : -670,000.00
RUnit Planned Period Percent : 33.00
RUnit Planned Cumul Percent : 33.00
RUnit Planned Full Percent : 8.25

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 0.330
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 165,000.00
SubBen 1 Unit Benefit : 165,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 0.330
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 165,000.00
SubBen 2 Unit Benefit : 165,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q1 RR Track Planned(Amount: 1.000; Date: 03/30/2013; Label: A1010

Outcome Details

Date : 03/30/2013
Observations : 1; Target Type : benchmark
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 1,000,000.00
R Actual Period : 0.00
R Actual Cumul : 0.00
R Actual Period Change : 0.00
R Actual Cumul Change : 0.00
R Planned Period Percent : 0.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 1,000,000.00
LCB Actual Period : 0.00
LCB Actual Cumul : 0.00
LCB Actual Period Change : 0.00
LCB Actual Cumul Change : 0.00
LCB Planned Period Percent : 0.00
LCB Planned Cumul Percent : 0.00
LCB Planned Full Percent : 0.00
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 1,000,000.00
RUnit Actual Period : 0.00
RUnit Actual Cumul : 0.00
RUnit Actual Period Change : 0.00
RUnit Actual Cumul Change : 0.00
RUnit Planned Period Percent : 0.00
RUnit Planned Cumul Percent : 0.00
RUnit Planned Full Percent : 0.00

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 1.000
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 500,000.00
SubBen 1 Unit Benefit : 500,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 1.000
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 500,000.00
SubBen 2 Unit Benefit : 500,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q2 RR Track Actual(Amount: 0.333; Date: 06/30/2013; Label: A1010

Outcome Details

Date : 06/30/2013
Observations : 1; Target Type : actual
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 2,000,000.00
R Actual Period : 333,000.00
R Actual Cumul : 663,000.00
R Actual Period Change : -667,000.00
R Actual Cumul Change : -1,337,000.00
R Planned Period Percent : 33.30
R Planned Cumul Percent : 33.15
R Planned Full Percent : 16.58
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 2,000,000.00
LCB Actual Period : 333,000.00
LCB Actual Cumul : 663,000.00
LCB Actual Period Change : -667,000.00
LCB Actual Cumul Change : -1,337,000.00
LCB Planned Period Percent : 33.30
LCB Planned Cumul Percent : 33.15
LCB Planned Full Percent : 16.58
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 2,000,000.00
RUnit Actual Period : 333,000.00
RUnit Actual Cumul : 663,000.00
RUnit Actual Period Change : -667,000.00
RUnit Actual Cumul Change : -1,337,000.00
RUnit Planned Period Percent : 33.30
RUnit Planned Cumul Percent : 33.15
RUnit Planned Full Percent : 16.58

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 0.333
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 166,500.00
SubBen 1 Unit Benefit : 166,500.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 0.333
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 166,500.00
SubBen 2 Unit Benefit : 166,500.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q2 RR Track Planned(Amount: 1.000; Date: 06/30/2013; Label: A1010

Outcome Details

Date : 06/30/2013
Observations : 1; Target Type : benchmark
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 2,000,000.00
R Actual Period : 0.00
R Actual Cumul : 0.00
R Actual Period Change : 0.00
R Actual Cumul Change : 0.00
R Planned Period Percent : 0.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 2,000,000.00
LCB Actual Period : 0.00
LCB Actual Cumul : 0.00
LCB Actual Period Change : 0.00
LCB Actual Cumul Change : 0.00
LCB Planned Period Percent : 0.00
LCB Planned Cumul Percent : 0.00
LCB Planned Full Percent : 0.00
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 2,000,000.00
RUnit Actual Period : 0.00
RUnit Actual Cumul : 0.00
RUnit Actual Period Change : 0.00
RUnit Actual Cumul Change : 0.00
RUnit Planned Period Percent : 0.00
RUnit Planned Cumul Percent : 0.00
RUnit Planned Full Percent : 0.00

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 1.000
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 500,000.00
SubBen 1 Unit Benefit : 500,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 1.000
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 500,000.00
SubBen 2 Unit Benefit : 500,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q3 RR Track Actual(Amount: 0.333; Date: 09/30/2013; Label: A1010

Outcome Details

Date : 09/30/2013
Observations : 1; Target Type : actual
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 3,000,000.00
R Actual Period : 333,000.00
R Actual Cumul : 996,000.00
R Actual Period Change : -667,000.00
R Actual Cumul Change : -2,004,000.00
R Planned Period Percent : 33.30
R Planned Cumul Percent : 33.20
R Planned Full Percent : 24.90
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 3,000,000.00
LCB Actual Period : 333,000.00
LCB Actual Cumul : 996,000.00
LCB Actual Period Change : -667,000.00
LCB Actual Cumul Change : -2,004,000.00
LCB Planned Period Percent : 33.30
LCB Planned Cumul Percent : 33.20
LCB Planned Full Percent : 24.90
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 3,000,000.00
RUnit Actual Period : 333,000.00
RUnit Actual Cumul : 996,000.00
RUnit Actual Period Change : -667,000.00
RUnit Actual Cumul Change : -2,004,000.00
RUnit Planned Period Percent : 33.30
RUnit Planned Cumul Percent : 33.20
RUnit Planned Full Percent : 24.90

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 0.333
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 166,500.00
SubBen 1 Unit Benefit : 166,500.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 0.333
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 166,500.00
SubBen 2 Unit Benefit : 166,500.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q3 RR Track Planned(Amount: 1.000; Date: 09/30/2013; Label: A1010

Outcome Details

Date : 09/30/2013
Observations : 1; Target Type : benchmark
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 3,000,000.00
R Actual Period : 0.00
R Actual Cumul : 0.00
R Actual Period Change : 0.00
R Actual Cumul Change : 0.00
R Planned Period Percent : 0.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 3,000,000.00
LCB Actual Period : 0.00
LCB Actual Cumul : 0.00
LCB Actual Period Change : 0.00
LCB Actual Cumul Change : 0.00
LCB Planned Period Percent : 0.00
LCB Planned Cumul Percent : 0.00
LCB Planned Full Percent : 0.00
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 3,000,000.00
RUnit Actual Period : 0.00
RUnit Actual Cumul : 0.00
RUnit Actual Period Change : 0.00
RUnit Actual Cumul Change : 0.00
RUnit Planned Period Percent : 0.00
RUnit Planned Cumul Percent : 0.00
RUnit Planned Full Percent : 0.00

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 1.000
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 500,000.00
SubBen 1 Unit Benefit : 500,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 1.000
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 500,000.00
SubBen 2 Unit Benefit : 500,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01

Outcome : 2013, Q4 RR Track Planned(Amount: 1.000; Date: 12/31/2013; Label: A1010

Outcome Details

Date : 12/31/2013
Observations : 1; Target Type : benchmark
R Planned Period : 1,000,000.00
R Plan Full : 4,000,000.00
R Plan Cumul : 4,000,000.00
R Actual Period : 0.00
R Actual Cumul : 0.00
R Actual Period Change : 0.00
R Actual Cumul Change : 0.00
R Planned Period Percent : 0.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
LCB Planned Period : 1,000,000.00
LCB Plan Full : 4,000,000.00
LCB Plan Cumul : 4,000,000.00
LCB Actual Period : 0.00
LCB Actual Cumul : 0.00
LCB Actual Period Change : 0.00
LCB Actual Cumul Change : 0.00
LCB Planned Period Percent : 0.00
LCB Planned Cumul Percent : 0.00
LCB Planned Full Percent : 0.00
REAA Planned Period : 0.00
REAA Plan Full : 0.00
REAA Plan Cumul : 0.00
REAA Actual Period : 0.00
REAA Actual Cumul : 0.00
REAA Actual Period Change : 0.00
REAA Actual Cumul Change : 0.00
REAA Planned Period Percent : 0.00
REAA Planned Cumul Percent : 0.00
REAA Planned Full Percent : 0.00
RUnit Planned Period : 1,000,000.00
RUnit Plan Full : 4,000,000.00
RUnit Plan Cumul : 4,000,000.00
RUnit Actual Period : 0.00
RUnit Actual Cumul : 0.00
RUnit Actual Period Change : 0.00
RUnit Actual Cumul Change : 0.00
RUnit Planned Period Percent : 0.00
RUnit Planned Cumul Percent : 0.00
RUnit Planned Full Percent : 0.00

SubBenefits

SubBen 1 Name : RR Track Installed
SubBen 1 Amount : 1.000
SubBen 1 Unit : mile
SubBen 1 Price : 500,000.00
SubBen 1 Total : 500,000.00
SubBen 1 Unit Benefit : 500,000.00
SubBen 1 Description : This measures the unit value of 1 mile of installed railroad track.
SubBen 1 Label : EVM1
SubBen 2 Name : Land
SubBen 2 Amount : 1.000
SubBen 2 Unit : mile
SubBen 2 Price : 500,000.00
SubBen 2 Total : 500,000.00
SubBen 2 Unit Benefit : 500,000.00
SubBen 2 Description : This subbenefit values the land purchased for a railroad.
SubBen 2 Label : re01
Dataset: Earned Value Management Examples IRI This recreation benefit estimate is computed using life cycle cycle totals, statistics, incremental change, and progress outcome analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.