Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
2011 NPS Visitor Hiker WTP

Net Present Value Benefit Calculation View

Progress

Introduction
This tool generates a variety of basic net present value stock statistics for DevTreks outputs.

Calculation View Description
v200a

Version: 1.7.0

Feedback About commercial/output/2011 NPS Visitor Hiker WTP/2141223450/outputnpvprogress1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions (beta)

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying LCA calculator after inserting, deleting, or updating, this linked view (that keeps the LCA calculator's linked views synchronized with these linkedviews).


Current view of document
2011 NPS Visitor Hiker WTP

Output Group : National Park Recreation Outputs

Output : 2011 NPS Visitor Hiker WTP

Output Details

Date : 09/29/2014
Observations : 1; Target : actual
R Planned Period : 45.00
R Plan Full : 0.00
R Plan Cumul : 0.00
R Actual Period : 45.00
R Actual Cumul : 45.00
R Actual Period Change : 0.00
R Actual Cumul Change : 45.00
R Planned Period Percent : 100.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
OutputQ Planned Period : 1.00
OutputQ Plan Full : 0.00
OutputQ Plan Cumul : 0.00
OutputQ Actual Period : 1.00
OutputQ Actual Cumul : 1.00
OutputQ Actual Period Change : 0.00
OutputQ Actual Cumul Change : 1.00
OutputQ Planned Period Percent : 100.00
OutputQ Planned Cumul Percent : 0.00
OutputQ Planned Full Percent : 0.00
RPrice Planned Period : 45.00
RPrice Plan Full : 0.00
RPrice Plan Cumul : 0.00
RPrice Actual Period : 45.00
RPrice Actual Cumul : 45.00
RPrice Actual Period Change : 0.00
RPrice Actual Cumul Change : 45.00
RPrice Planned Period Percent : 100.00
RPrice Planned Cumul Percent : 0.00
RPrice Planned Full Percent : 0.00

Output Series : 2007 NPS Visitor Hiker WTP

Output Details

Date : 01/01/2007
Observations : 1; Target : actual
R Planned Period : 38.50
R Plan Full : 38.50
R Plan Cumul : 38.50
R Actual Period : 52.00
R Actual Cumul : 52.00
R Actual Period Change : 13.50
R Actual Cumul Change : 13.50
R Planned Period Percent : 135.06
R Planned Cumul Percent : 135.06
R Planned Full Percent : 135.06
OutputQ Planned Period : 1.00
OutputQ Plan Full : 1.00
OutputQ Plan Cumul : 1.00
OutputQ Actual Period : 1.00
OutputQ Actual Cumul : 1.00
OutputQ Actual Period Change : 0.00
OutputQ Actual Cumul Change : 0.00
OutputQ Planned Period Percent : 100.00
OutputQ Planned Cumul Percent : 100.00
OutputQ Planned Full Percent : 100.00
RPrice Planned Period : 38.50
RPrice Plan Full : 38.50
RPrice Plan Cumul : 38.50
RPrice Actual Period : 52.00
RPrice Actual Cumul : 52.00
RPrice Actual Period Change : 13.50
RPrice Actual Cumul Change : 13.50
RPrice Planned Period Percent : 135.06
RPrice Planned Cumul Percent : 135.06
RPrice Planned Full Percent : 135.06

Output Series : 2008 NPS Visitor Hiker WTP

Output Details

Date : 01/01/2008
Observations : 1; Target : benchmark
R Planned Period : 38.50
R Plan Full : 38.50
R Plan Cumul : 38.50
R Actual Period : 0.00
R Actual Cumul : 0.00
R Actual Period Change : 0.00
R Actual Cumul Change : 0.00
R Planned Period Percent : 0.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
OutputQ Planned Period : 1.00
OutputQ Plan Full : 1.00
OutputQ Plan Cumul : 1.00
OutputQ Actual Period : 0.00
OutputQ Actual Cumul : 0.00
OutputQ Actual Period Change : 0.00
OutputQ Actual Cumul Change : 0.00
OutputQ Planned Period Percent : 0.00
OutputQ Planned Cumul Percent : 0.00
OutputQ Planned Full Percent : 0.00
RPrice Planned Period : 38.50
RPrice Plan Full : 38.50
RPrice Plan Cumul : 38.50
RPrice Actual Period : 0.00
RPrice Actual Cumul : 0.00
RPrice Actual Period Change : 0.00
RPrice Actual Cumul Change : 0.00
RPrice Planned Period Percent : 0.00
RPrice Planned Cumul Percent : 0.00
RPrice Planned Full Percent : 0.00

Output Series : 2009 NPS Visitor Hiker WTP

Output Details

Date : 01/01/2009
Observations : 1; Target : actual
R Planned Period : 38.50
R Plan Full : 38.50
R Plan Cumul : 38.50
R Actual Period : 40.00
R Actual Cumul : 92.00
R Actual Period Change : 1.50
R Actual Cumul Change : 53.50
R Planned Period Percent : 103.90
R Planned Cumul Percent : 238.96
R Planned Full Percent : 238.96
OutputQ Planned Period : 1.00
OutputQ Plan Full : 1.00
OutputQ Plan Cumul : 1.00
OutputQ Actual Period : 1.00
OutputQ Actual Cumul : 2.00
OutputQ Actual Period Change : 0.00
OutputQ Actual Cumul Change : 1.00
OutputQ Planned Period Percent : 100.00
OutputQ Planned Cumul Percent : 200.00
OutputQ Planned Full Percent : 200.00
RPrice Planned Period : 38.50
RPrice Plan Full : 38.50
RPrice Plan Cumul : 38.50
RPrice Actual Period : 40.00
RPrice Actual Cumul : 92.00
RPrice Actual Period Change : 1.50
RPrice Actual Cumul Change : 53.50
RPrice Planned Period Percent : 103.90
RPrice Planned Cumul Percent : 238.96
RPrice Planned Full Percent : 238.96

Output Series : 2010 NPS Visitor Hiker WTP

Output Details

Date : 01/01/2010
Observations : 1; Target : actual
R Planned Period : 42.50
R Plan Full : 0.00
R Plan Cumul : 0.00
R Actual Period : 42.50
R Actual Cumul : 134.50
R Actual Period Change : 0.00
R Actual Cumul Change : 134.50
R Planned Period Percent : 100.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
OutputQ Planned Period : 1.00
OutputQ Plan Full : 0.00
OutputQ Plan Cumul : 0.00
OutputQ Actual Period : 1.00
OutputQ Actual Cumul : 3.00
OutputQ Actual Period Change : 0.00
OutputQ Actual Cumul Change : 3.00
OutputQ Planned Period Percent : 100.00
OutputQ Planned Cumul Percent : 0.00
OutputQ Planned Full Percent : 0.00
RPrice Planned Period : 42.50
RPrice Plan Full : 0.00
RPrice Plan Cumul : 0.00
RPrice Actual Period : 42.50
RPrice Actual Cumul : 134.50
RPrice Actual Period Change : 0.00
RPrice Actual Cumul Change : 134.50
RPrice Planned Period Percent : 100.00
RPrice Planned Cumul Percent : 0.00
RPrice Planned Full Percent : 0.00

Output Series : 2011 NPS Visitor Hiker WTP

Output Details

Date : 01/01/2011
Observations : 1; Target : actual
R Planned Period : 45.00
R Plan Full : 0.00
R Plan Cumul : 0.00
R Actual Period : 45.00
R Actual Cumul : 179.50
R Actual Period Change : 0.00
R Actual Cumul Change : 179.50
R Planned Period Percent : 100.00
R Planned Cumul Percent : 0.00
R Planned Full Percent : 0.00
OutputQ Planned Period : 1.00
OutputQ Plan Full : 0.00
OutputQ Plan Cumul : 0.00
OutputQ Actual Period : 1.00
OutputQ Actual Cumul : 4.00
OutputQ Actual Period Change : 0.00
OutputQ Actual Cumul Change : 4.00
OutputQ Planned Period Percent : 100.00
OutputQ Planned Cumul Percent : 0.00
OutputQ Planned Full Percent : 0.00
RPrice Planned Period : 45.00
RPrice Plan Full : 0.00
RPrice Plan Cumul : 0.00
RPrice Actual Period : 45.00
RPrice Actual Cumul : 179.50
RPrice Actual Period Change : 0.00
RPrice Actual Cumul Change : 179.50
RPrice Planned Period Percent : 100.00
RPrice Planned Cumul Percent : 0.00
RPrice Planned Full Percent : 0.00
Dataset: 2011 NPS Visitor Hiker WTP IRI This building construction benefit estimate is computed using life cycle cycle output calculators and totals, statistics, incremental change, and progress analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.