Go to GreenTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
CTAP Ex 3 - Generic RMI

Stock Calculation View

Stock Budgeting 1 Output Calculator

Introduction
This tool tracks resource stock indicators for output uris. Up to 15 new indicators can be added for each output.

Calculation View Description
v216a

Version: 1.9.0

Feedback About carbon/output/CTAP Ex 3 - Generic RMI/2141223463/sb02

Step 1 of 3. Make Selections

Stock Indicators

Indicator 1

Indicator 2

Indicator 3

Indicator 4

Indicator 5

Indicator 6

Indicator 7

Indicator 8

Indicator 9

Indicator 10

Step 2 of 3. Enter Stock Indicators

Relations

Use In Childs?
Overwrite Childs?

More Stock Indicators

Indicator 11

Indicator 12

Indicator 13

Indicator 14

Indicator 15

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Indicators: Enter up to 10 indicators.
  • Step 1. Indicator Name and Description: Name and description for each indicator.
  • Step 1. Indicator Date: Make sure that the benchmark, targets, actual, indicators have distinct dates.
  • Step 1. Distribution Type: The numeric distribution of QT. Refer to the Stock Calculation 1 reference.
  • Step 1. Math Expression:A mathematical expression containing one or more of the Q1 to Q5 variables and/or sibling indicator Q1 to QTM variables. Use strings that identify both the indicator (I1, I2, … In) and the Qx property (Q … QTM), with a period separator between them. Examples include:((I1.Q1 + I1.Q2) * I1.Q3) + I1.Q4)) - (2 * I1.Q5)
  • Step 1. Math Operator Type: Mathematical operation to use with QT. MathTypes include: equalto, lessthan, greaterthan, lessthanorequalto, and greaterthanorequalto. Refer to the Stock Calculation 1 reference for the algorithms.
  • Step 1. Math Type and Math Sub Type: Mathematical algorithm and subalgorithm to use with Distribution Type, QT, QTD1, and QTD2 to solve for QTM, QTL, and QTU. Refer to the Stock Calculation 1 reference for the algorithms.
  • Step 1. QT Amount and Unit: The Unit must be manually entered. The Amount will be the result of the mathematical calculation.
  • Step 1. QTD1 Amount and Unit: First distribution, or shape, parameter for QT.
  • Step 1. QTD2 Amount and Unit: Second distribution, or scale, for QT.
  • Step 1. BaseIO: Base input or output property to update with this indicator's QTM property.
  • Step 1. QTM Amount and Unit: Most Likely Estimate for QT. The Unit must be manually entered. The Amount will be the result of the mathematical algorithm.
  • Step 1. QTL Amount and Unit: Low Estimate or QT. The Unit must be manually entered. The Amount will be the result of the mathematical algorithm.
  • Step 1. QTU Amount and Unit: High Estimate for QT. The Unit must be manually entered. The Amount will be the result of the mathematical algorithm.
  • Step 1. Math Result: TEXT string holding results of calculation.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. Overwrite Descendants?: True to insert or update all of the attributes of this same calculator in all children. False only updates children attributes that are controlled by the developer of this calculator (i.e. version, stylehsheet name, relatedcalculatorstype ...)
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: When the Use Same Calculator Pack in Descendant is true, uses this value to determine which descendant calculator to update. Inserts a new descendant when no descendant has this same name. Updates the descendant that has this same name.
  • Step 2. Indicators: Enter up to 5 indicators.
  • Step 2. Target Type: Used with Progress analyzers to identify benchmark and actual indicators.
  • Step 2. Altern Type: Used with Change by Alternative analyzers to identify alternatives to compare.
  • Step 2. Score Math Expression: A mathematical expression containing one or more of the children indicator Q1 to QTM variables. Use strings that identify both the indicator (I1, I2, … In) and the Qx property (Q … QTM), with a period separator between them. Examples include:((I1.QTM + I2.QTM) * I3.Q3) + I4.QTM)) - (2 * I5.QTM)
  • Step 2. Score Amount and Unit: The Unit must be manually entered. The Amount will be the result of the Math Expression calculation.
  • Step 2. ScoreD1 Amount and Unit: First distribution variable for Score.
  • Step 2. ScoreD2 Amount and Unit: Second distribution for Score.
  • Step 2. Distribution Type: The numeric distribution of Score. Refer to the Stock Calculation 1 reference.
  • Step 2. Score Math Type and Math Sub Type: Mathematical algorithm and subalgorithm to use with Distribution Type, Score, ScoreD1, and ScoreD2 to solve for ScoreM, ScoreL, and ScoreU. Refer to the Stock Calculation 1 reference for the algorithms.
  • Step 2. Score Most Likely, Score Low, Score High, Amounts and Units: Results of Distribution Type and Math Type calculations.
  • Step 2. Iterations: Number of iterations to use when drawing random number samples for some algorithms.
  • Step 2. Confidence Interval: Level of confidence interal to use when reporting all Score and Indicator high and low amounts. Should be an integer such as 95, 90, or 40.
  • Step 2. Random Seed: Any positive integer, except 0, will result in the same set of random variables being used each time a calculation is run.
  • Step 2. Score BaseIO: Base input or output property to update with the Score Most Likely property.

References

  • Refer to the Stock Calculation 1 reference.

Current view of document
CTAP Ex 3 - Generic RMI

Output Group: CTAP Output Examples

Output : CTAP Ex 3 - Generic RMI

Indicators

Math Expression: I3.QTM
Score Amount: 388,495.4029
Score Unit: RMI
Score D1 Amount: 388,069.0927
Score D1 Unit: mean
Score D2 Amount: 10,000.0000
Score D2 Unit: sd
Distribution Type: normal
Math Type: algorithm1
Score Most Amount: 388,176.6562
Score Most Unit: RMI
Score Low Amount: 388,011.1268
Score Low Unit: lower 90 % ci
Score High Amount: 388,342.1856
Score High Unit: upper 90 % ci
Iterations: 10000
Math Sub Type: subalgorithm1
Confid Int: 90
Random Seed: 7
Base IO: none
Score Math Result: sampled descriptive statistics N,Total,Mean,Median,StdDev,Var,Min,Max 10000, 3881766562.3681, 388176.6562, 388119.5540, 10032.0841, 100642710.5402, 348613.2644, 425983.4147, sampled cumulative density function 0.00,0.10,0.20,0.30,0.40,0.50,0.60,0.70,0.80,0.90,1.00 348613.2644,375307.9999,379827.8064,382969.5327,385561.2455,388121.0351,390682.3669,393459.4494,396666.7414,401190.2615,425983.4147
Indic 1 Name: Risk Management Indicators Distribution
Label: 1A
Date: 10/28/2015
Rel Label: none
Math Type: algorithm1
Dist Type: none
Q1 Amount: 0.8718
Q1 Unit: location1 rmi
Q2 Amount: 0.8867
Q2 Unit: location2 rmi
Q3 Amount: 0.8860
Q3 Unit: location3 rmi
Q4 Amount: 0.9016
Q4 Unit: location4 rmi
Q5 Amount: 0.8992
Q5 Unit: location5 rmi
Math Express: I1.Q1.distribtype + I1.Q2.QT + I1.Q3.QTUnit + I1.Q4.QTD1+ I1.Q5.QTD1Unit + I1.Q6.QTD2 + I1.Q7.QTD2Unit + I1.Q8.normalization + I1.Q9.weight + I1.Q10.quantity
Math Operator: equalto
QT Amount: 1.7586
QT Unit: base MCA score
QT D1 Amount: 1.7575
QT D1 Unit: low ci
QT D2 Amount: 1.7596
QT D2 Unit: high ci
QT Most Amount: 1.8147
QT Most Unit: ri all locations for B
QT Low Amount: 1.8138
QT Low Unit: lower 90 % ci
QT High Amount: 1.8156
QT High Unit: upper 90 % ci
Math Sub Type: subalgorithm11
Base IO: none
Indic 1 Description: This indicator is used in a CTAP tutorial.
Indic 2 Name: Costs Distribution
Label: 2A
Date: 10/28/2015
Rel Label: none
Math Type: algorithm1
Type: none
Q1 Amount: 0.0000
Q1 Unit: none
Q2 Amount: 0.0000
Q2 Unit: none
Q3 Amount: 0.0000
Q3 Unit: none
Q4 Amount: 0.0000
Q4 Unit: none
Q5 Amount: 0.0000
Q5 Unit: none
Math Express: I2.Q1.installcost + I2.Q2.installdistrib + I2.Q3.omcost+ I2.Q4.omdistrib + I2.Q5.isprojectcost
Math Operator: equalto
QT Amount: 0.0000
QT Unit: mean avg annual costs
QT D1 Amount: 0.0000
QT D1 Unit: none
QT D2 Amount: 0.0000
QT D2 Unit: none
QT Most Amount: 2,924.0239
QT Most Unit: mean avg annual costs
QT Low Amount: 2,919.1883
QT Low Unit: lower 90 % ci
QT High Amount: 2,928.8595
QT High Unit: upper 90 % ci
Math Sub Type: subalgorithm11
Base IO: none
Indic 2 Description: This indicator is used in a CTAP tutorial.
Indic 3 Name: Cost Effectiveness Analysis
Label: 3A
Date: 10/28/2015
Rel Label: none
Math Type: algorithm1
Type: none
Q1 Amount: 1.7585
Q1 Unit: base damage
Q2 Amount: 203.7036
Q2 Unit: base cost
Q3 Amount: 1.8146
Q3 Unit: AC1A_B damage
Q4 Amount: 21,998.2957
Q4 Unit: AC1A_B cost
Q5 Amount: 0.0000
Q5 Unit: none
Math Express: I3.Q1.distribtype + I3.Q2.QTM + I3.Q3.QTMUnit + I3.Q4.QTL+ I3.Q5.QTLUnit + I3.Q6.QTU + I3.Q7.QTUUnit + I3.Q8.QTUUnit + I3.Q9.quantity
Math Operator: equalto
QT Amount: 388,495.4029
QT Unit: net benefits
QT D1 Amount: 0.0000
QT D1 Unit: none
QT D2 Amount: 0.0000
QT D2 Unit: none
QT Most Amount: 388,495.4029
QT Most Unit: 2_QTM_0.12_50, cer
QT Low Amount: 386,475.0888
QT Low Unit: lower 90 % ci
QT High Amount: 389,137.9055
QT High Unit: upper 90 % ci
Math Sub Type: subalgorithm11
Base IO: none
Indic 3 Description: This indicator is used in a CTAP tutorial.

Output Series : CTAP Example 3 - Generic RMI

Indicators

Math Expression: I3.QTM
Score Amount: 388,495.4029
Score Unit: RMI
Score D1 Amount: 388,069.0927
Score D1 Unit: mean
Score D2 Amount: 10,000.0000
Score D2 Unit: sd
Distribution Type: normal
Math Type: algorithm1
Score Most Amount: 388,176.6562
Score Most Unit: RMI
Score Low Amount: 388,011.1268
Score Low Unit: lower 90 % ci
Score High Amount: 388,342.1856
Score High Unit: upper 90 % ci
Iterations: 10000
Math Sub Type: subalgorithm1
Confid Int: 90
Random Seed: 7
Base IO: none
Score Math Result: sampled descriptive statistics N,Total,Mean,Median,StdDev,Var,Min,Max 10000, 3881766562.3681, 388176.6562, 388119.5540, 10032.0841, 100642710.5402, 348613.2644, 425983.4147, sampled cumulative density function 0.00,0.10,0.20,0.30,0.40,0.50,0.60,0.70,0.80,0.90,1.00 348613.2644,375307.9999,379827.8064,382969.5327,385561.2455,388121.0351,390682.3669,393459.4494,396666.7414,401190.2615,425983.4147
Indic 1 Name: Risk Management Indicators Distribution
Label: 1A
Date: 10/28/2015
Rel Label: none
Math Type: algorithm1
Dist Type: none
Q1 Amount: 0.8718
Q1 Unit: location1 rmi
Q2 Amount: 0.8867
Q2 Unit: location2 rmi
Q3 Amount: 0.8860
Q3 Unit: location3 rmi
Q4 Amount: 0.9016
Q4 Unit: location4 rmi
Q5 Amount: 0.8992
Q5 Unit: location5 rmi
Math Express: I1.Q1.distribtype + I1.Q2.QT + I1.Q3.QTUnit + I1.Q4.QTD1+ I1.Q5.QTD1Unit + I1.Q6.QTD2 + I1.Q7.QTD2Unit + I1.Q8.normalization + I1.Q9.weight + I1.Q10.quantity
Math Operator: equalto
QT Amount: 1.7586
QT Unit: base MCA score
QT D1 Amount: 1.7575
QT D1 Unit: low ci
QT D2 Amount: 1.7596
QT D2 Unit: high ci
QT Most Amount: 1.8147
QT Most Unit: ri all locations for B
QT Low Amount: 1.8138
QT Low Unit: lower 90 % ci
QT High Amount: 1.8156
QT High Unit: upper 90 % ci
Math Sub Type: subalgorithm11
Base IO: none
Indic 1 Description: This indicator is used in a CTAP tutorial.
Indic 2 Name: Costs Distribution
Label: 2A
Date: 10/28/2015
Rel Label: none
Math Type: algorithm1
Type: none
Q1 Amount: 0.0000
Q1 Unit: none
Q2 Amount: 0.0000
Q2 Unit: none
Q3 Amount: 0.0000
Q3 Unit: none
Q4 Amount: 0.0000
Q4 Unit: none
Q5 Amount: 0.0000
Q5 Unit: none
Math Express: I2.Q1.installcost + I2.Q2.installdistrib + I2.Q3.omcost+ I2.Q4.omdistrib + I2.Q5.isprojectcost
Math Operator: equalto
QT Amount: 0.0000
QT Unit: mean avg annual costs
QT D1 Amount: 0.0000
QT D1 Unit: none
QT D2 Amount: 0.0000
QT D2 Unit: none
QT Most Amount: 2,924.0239
QT Most Unit: mean avg annual costs
QT Low Amount: 2,919.1883
QT Low Unit: lower 90 % ci
QT High Amount: 2,928.8595
QT High Unit: upper 90 % ci
Math Sub Type: subalgorithm11
Base IO: none
Indic 2 Description: This indicator is used in a CTAP tutorial.
Indic 3 Name: Cost Effectiveness Analysis
Label: 3A
Date: 10/28/2015
Rel Label: none
Math Type: algorithm1
Type: none
Q1 Amount: 1.7585
Q1 Unit: base damage
Q2 Amount: 203.7036
Q2 Unit: base cost
Q3 Amount: 1.8146
Q3 Unit: AC1A_B damage
Q4 Amount: 21,998.2957
Q4 Unit: AC1A_B cost
Q5 Amount: 0.0000
Q5 Unit: none
Math Express: I3.Q1.distribtype + I3.Q2.QTM + I3.Q3.QTMUnit + I3.Q4.QTL+ I3.Q5.QTLUnit + I3.Q6.QTU + I3.Q7.QTUUnit + I3.Q8.QTUUnit + I3.Q9.quantity
Math Operator: equalto
QT Amount: 388,495.4029
QT Unit: net benefits
QT D1 Amount: 0.0000
QT D1 Unit: none
QT D2 Amount: 0.0000
QT D2 Unit: none
QT Most Amount: 388,495.4029
QT Most Unit: 2_QTM_0.12_50, cer
QT Low Amount: 386,475.0888
QT Low Unit: lower 90 % ci
QT High Amount: 389,137.9055
QT High Unit: upper 90 % ci
Math Sub Type: subalgorithm11
Base IO: none
Indic 3 Description: This indicator is used in a CTAP tutorial.
Dataset: CTAP Ex 3 - Generic RMI IRI his output is used to support a CTAP tutorial for Risk Management Indexes.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.