Go to HealthTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
0SR9019TP- 2007 Exam 2 Hip Replacement Treatment

Life Cycle Stock Analyzer Views

Hip Replacement Costs

Introduction
This tool generates a variety of basic life cycle stock statistics for DevTreks capital budgets and operating budgets.

Calculation View Description
Sample health care treatment cost used in a tutorial. v220a

Version: 1.7.0

Feedback About urbandelivery/investmenttimeperiod/0SR9019TP- 2007 Exam 2 Hip Replacement Treatment/2108448210/investmentlcatotal1

Step 1 of 3. Make Selections


Date: 2013-06-01T00:00:00

Step 2 of 3. Analyze

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to either operating budgets or capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
0SR9019TP- 2007 Exam 2 Hip Replacement Treatment

Investment Group : DRG469- Major Joint Replacement or Reattachment of Lower Extremity

Benefit Details

Total Revenue : 0.00
Total LCB : 0.00
Total EAA : 0.00
Total Unit : 0.00

Cost Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 14945.67
Total LCC : 14945.67
Total EAA : 794.97
Total Unit : 14945.67
SubCost 1 Name : Materials, General
SubCost 1 Amount : 3.000
SubCost 1 Unit : each
SubCost 1 Price : 1,032.00
SubCost 1 Total : 1,032.00
SubCost 1 Unit Cost : 1,032.00
SubCost 1 Description : These materials include paper dress, room preparation, and sundry materials.
SubCost 1 Label : OSR9019M1
SubCost 2 Name : Labor, Nurse
SubCost 2 Amount : 19.000
SubCost 2 Unit : hour
SubCost 2 Price : 796.00
SubCost 2 Total : 2,109.00
SubCost 2 Unit Cost : 2,109.00
SubCost 2 Description : This labor includes answering phone calls, minor check ups, and administrative visits.
SubCost 2 Label : OSR9019L1
SubCost 3 Name : Drugs, Pain Relief, Drug 01
SubCost 3 Amount : 104.500
SubCost 3 Unit : pill
SubCost 3 Price : 341.75
SubCost 3 Total : 1,338.50
SubCost 3 Unit Cost : 1,338.50
SubCost 3 Description : This drug, Drug 01, is used for pain relief medicine used by the patient. These are taken three times a day for 4 weeks. And then one time a day for two weeks. The references not that a combination of ibuprofen and anti-inflammatory drugs are used.
SubCost 3 Label : OSR9019D1
SubCost 4 Name : Room, Hospital Stay
SubCost 4 Amount : 3.500
SubCost 4 Unit : day
SubCost 4 Price : 1,500.00
SubCost 4 Total : 5,250.00
SubCost 4 Unit Cost : 5,250.00
SubCost 4 Description : This is the daily charge for staying in the hospital. It covers all expenses.
SubCost 4 Label : OSR9019R1
SubCost 5 Name : Overhead, Administrative
SubCost 5 Amount : 7,810.000
SubCost 5 Unit :
SubCost 5 Price : 0.28
SubCost 5 Total : 2,186.80
SubCost 5 Unit Cost : 2,186.80
SubCost 5 Description : Administrative overhead is calculated as 28% of the total surgery cost. The cost includes the facilities, staff, and equipment, associated with the surgery.
SubCost 5 Label : OSR9019A1
SubCost 6 Name : Profit
SubCost 6 Amount : 9,997.000
SubCost 6 Unit : percent
SubCost 6 Price : 0.21
SubCost 6 Total : 2,099.37
SubCost 6 Unit Cost : 2,099.37
SubCost 6 Description : Profit is calculated as 21% of the total surgery cost.
SubCost 6 Label : OSR9019P1
SubCost 7 Name : Tests, X-Rays
SubCost 7 Amount : 1.000
SubCost 7 Unit : set
SubCost 7 Price : 120.00
SubCost 7 Total : 120.00
SubCost 7 Unit Cost : 120.00
SubCost 7 Description : These are standard x-rays of the hip area.
SubCost 7 Label : OSR9019T1
SubCost 8 Name : Laboratory Fees
SubCost 8 Amount : 1.000
SubCost 8 Unit : each
SubCost 8 Price : 10.00
SubCost 8 Total : 10.00
SubCost 8 Unit Cost : 10.00
SubCost 8 Description : Laboratory fees are associated with taking x-rays.
SubCost 8 Label : OSR9019T1.
SubCost 9 Name : Transportation, Taxi
SubCost 9 Amount : 401.000
SubCost 9 Unit : mile
SubCost 9 Price : 301.25
SubCost 9 Total : 800.00
SubCost 9 Unit Cost : 800.00
SubCost 9 Description : These expenses are for hiring a taxi to go shopping and to visit the hospital. Four trips are taken each week for five weeks.
SubCost 9 Label : OSR9019H1

Investment :

Benefit Details

Total Revenue : 0.00
Total LCB : 0.00
Total EAA : 0.00
Total Unit : 0.00

Cost Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 14945.67
Total LCC : 14945.67
Total EAA : 794.97
Total Unit : 14945.67
SubCost 1 Name : Materials, General
SubCost 1 Amount : 3.000
SubCost 1 Unit : each
SubCost 1 Price : 1,032.00
SubCost 1 Total : 1,032.00
SubCost 1 Unit Cost : 1,032.00
SubCost 1 Description : These materials include paper dress, room preparation, and sundry materials.
SubCost 1 Label : OSR9019M1
SubCost 2 Name : Labor, Nurse
SubCost 2 Amount : 19.000
SubCost 2 Unit : hour
SubCost 2 Price : 796.00
SubCost 2 Total : 2,109.00
SubCost 2 Unit Cost : 2,109.00
SubCost 2 Description : This labor includes answering phone calls, minor check ups, and administrative visits.
SubCost 2 Label : OSR9019L1
SubCost 3 Name : Drugs, Pain Relief, Drug 01
SubCost 3 Amount : 104.500
SubCost 3 Unit : pill
SubCost 3 Price : 341.75
SubCost 3 Total : 1,338.50
SubCost 3 Unit Cost : 1,338.50
SubCost 3 Description : This drug, Drug 01, is used for pain relief medicine used by the patient. These are taken three times a day for 4 weeks. And then one time a day for two weeks. The references not that a combination of ibuprofen and anti-inflammatory drugs are used.
SubCost 3 Label : OSR9019D1
SubCost 4 Name : Room, Hospital Stay
SubCost 4 Amount : 3.500
SubCost 4 Unit : day
SubCost 4 Price : 1,500.00
SubCost 4 Total : 5,250.00
SubCost 4 Unit Cost : 5,250.00
SubCost 4 Description : This is the daily charge for staying in the hospital. It covers all expenses.
SubCost 4 Label : OSR9019R1
SubCost 5 Name : Overhead, Administrative
SubCost 5 Amount : 7,810.000
SubCost 5 Unit :
SubCost 5 Price : 0.28
SubCost 5 Total : 2,186.80
SubCost 5 Unit Cost : 2,186.80
SubCost 5 Description : Administrative overhead is calculated as 28% of the total surgery cost. The cost includes the facilities, staff, and equipment, associated with the surgery.
SubCost 5 Label : OSR9019A1
SubCost 6 Name : Profit
SubCost 6 Amount : 9,997.000
SubCost 6 Unit : percent
SubCost 6 Price : 0.21
SubCost 6 Total : 2,099.37
SubCost 6 Unit Cost : 2,099.37
SubCost 6 Description : Profit is calculated as 21% of the total surgery cost.
SubCost 6 Label : OSR9019P1
SubCost 7 Name : Tests, X-Rays
SubCost 7 Amount : 1.000
SubCost 7 Unit : set
SubCost 7 Price : 120.00
SubCost 7 Total : 120.00
SubCost 7 Unit Cost : 120.00
SubCost 7 Description : These are standard x-rays of the hip area.
SubCost 7 Label : OSR9019T1
SubCost 8 Name : Laboratory Fees
SubCost 8 Amount : 1.000
SubCost 8 Unit : each
SubCost 8 Price : 10.00
SubCost 8 Total : 10.00
SubCost 8 Unit Cost : 10.00
SubCost 8 Description : Laboratory fees are associated with taking x-rays.
SubCost 8 Label : OSR9019T1.
SubCost 9 Name : Transportation, Taxi
SubCost 9 Amount : 401.000
SubCost 9 Unit : mile
SubCost 9 Price : 301.25
SubCost 9 Total : 800.00
SubCost 9 Unit Cost : 800.00
SubCost 9 Description : These expenses are for hiring a taxi to go shopping and to visit the hospital. Four trips are taken each week for five weeks.
SubCost 9 Label : OSR9019H1

Time Period : 0SR9019TP- 2007 Exam 2 Hip Replacement Treatment

Benefit Details

Total Revenue : 0.00
Total LCB : 0.00
Total EAA : 0.00
Total Unit : 0.00

Cost Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 14945.67
Total LCC : 14945.67
Total EAA : 794.97
Total Unit : 14945.67
SubCost 1 Name : Materials, General
SubCost 1 Amount : 3.000
SubCost 1 Unit : each
SubCost 1 Price : 1,032.00
SubCost 1 Total : 1,032.00
SubCost 1 Unit Cost : 1,032.00
SubCost 1 Description : These materials include paper dress, room preparation, and sundry materials.
SubCost 1 Label : OSR9019M1
SubCost 2 Name : Labor, Nurse
SubCost 2 Amount : 19.000
SubCost 2 Unit : hour
SubCost 2 Price : 796.00
SubCost 2 Total : 2,109.00
SubCost 2 Unit Cost : 2,109.00
SubCost 2 Description : This labor includes answering phone calls, minor check ups, and administrative visits.
SubCost 2 Label : OSR9019L1
SubCost 3 Name : Drugs, Pain Relief, Drug 01
SubCost 3 Amount : 104.500
SubCost 3 Unit : pill
SubCost 3 Price : 341.75
SubCost 3 Total : 1,338.50
SubCost 3 Unit Cost : 1,338.50
SubCost 3 Description : This drug, Drug 01, is used for pain relief medicine used by the patient. These are taken three times a day for 4 weeks. And then one time a day for two weeks. The references not that a combination of ibuprofen and anti-inflammatory drugs are used.
SubCost 3 Label : OSR9019D1
SubCost 4 Name : Room, Hospital Stay
SubCost 4 Amount : 3.500
SubCost 4 Unit : day
SubCost 4 Price : 1,500.00
SubCost 4 Total : 5,250.00
SubCost 4 Unit Cost : 5,250.00
SubCost 4 Description : This is the daily charge for staying in the hospital. It covers all expenses.
SubCost 4 Label : OSR9019R1
SubCost 5 Name : Overhead, Administrative
SubCost 5 Amount : 7,810.000
SubCost 5 Unit :
SubCost 5 Price : 0.28
SubCost 5 Total : 2,186.80
SubCost 5 Unit Cost : 2,186.80
SubCost 5 Description : Administrative overhead is calculated as 28% of the total surgery cost. The cost includes the facilities, staff, and equipment, associated with the surgery.
SubCost 5 Label : OSR9019A1
SubCost 6 Name : Profit
SubCost 6 Amount : 9,997.000
SubCost 6 Unit : percent
SubCost 6 Price : 0.21
SubCost 6 Total : 2,099.37
SubCost 6 Unit Cost : 2,099.37
SubCost 6 Description : Profit is calculated as 21% of the total surgery cost.
SubCost 6 Label : OSR9019P1
SubCost 7 Name : Tests, X-Rays
SubCost 7 Amount : 1.000
SubCost 7 Unit : set
SubCost 7 Price : 120.00
SubCost 7 Total : 120.00
SubCost 7 Unit Cost : 120.00
SubCost 7 Description : These are standard x-rays of the hip area.
SubCost 7 Label : OSR9019T1
SubCost 8 Name : Laboratory Fees
SubCost 8 Amount : 1.000
SubCost 8 Unit : each
SubCost 8 Price : 10.00
SubCost 8 Total : 10.00
SubCost 8 Unit Cost : 10.00
SubCost 8 Description : Laboratory fees are associated with taking x-rays.
SubCost 8 Label : OSR9019T1.
SubCost 9 Name : Transportation, Taxi
SubCost 9 Amount : 401.000
SubCost 9 Unit : mile
SubCost 9 Price : 301.25
SubCost 9 Total : 800.00
SubCost 9 Unit Cost : 800.00
SubCost 9 Description : These expenses are for hiring a taxi to go shopping and to visit the hospital. Four trips are taken each week for five weeks.
SubCost 9 Label : OSR9019H1
Outcomes

Outcome : 0SR9019- 2007 Replace Hip Joint with Metal Syn Subs, Cem, Open(Amount: 1.000; Date: 12/31/2007

Benefit Details

Total Revenue : 0.00
Total LCB : 0.00
Total EAA : 0.00
Total Unit : 0.00
Components

Component : 0SR9019 2- 2007 Replace Hip Joint with Metal Syn Subs, Cem, Open

Cost Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 14945.67
Total LCC : 14945.67
Total EAA : 794.97
Total Unit : 14945.67
SubCost 1 Name : Materials, General
SubCost 1 Amount : 3.000
SubCost 1 Unit : each
SubCost 1 Price : 1,032.00
SubCost 1 Total : 1,032.00
SubCost 1 Unit Cost : 1,032.00
SubCost 1 Description : These materials include paper dress, room preparation, and sundry materials.
SubCost 1 Label : OSR9019M1
SubCost 2 Name : Labor, Nurse
SubCost 2 Amount : 19.000
SubCost 2 Unit : hour
SubCost 2 Price : 796.00
SubCost 2 Total : 2,109.00
SubCost 2 Unit Cost : 2,109.00
SubCost 2 Description : This labor includes answering phone calls, minor check ups, and administrative visits.
SubCost 2 Label : OSR9019L1
SubCost 3 Name : Drugs, Pain Relief, Drug 01
SubCost 3 Amount : 104.500
SubCost 3 Unit : pill
SubCost 3 Price : 341.75
SubCost 3 Total : 1,338.50
SubCost 3 Unit Cost : 1,338.50
SubCost 3 Description : This drug, Drug 01, is used for pain relief medicine used by the patient. These are taken three times a day for 4 weeks. And then one time a day for two weeks. The references not that a combination of ibuprofen and anti-inflammatory drugs are used.
SubCost 3 Label : OSR9019D1
SubCost 4 Name : Room, Hospital Stay
SubCost 4 Amount : 3.500
SubCost 4 Unit : day
SubCost 4 Price : 1,500.00
SubCost 4 Total : 5,250.00
SubCost 4 Unit Cost : 5,250.00
SubCost 4 Description : This is the daily charge for staying in the hospital. It covers all expenses.
SubCost 4 Label : OSR9019R1
SubCost 5 Name : Overhead, Administrative
SubCost 5 Amount : 7,810.000
SubCost 5 Unit :
SubCost 5 Price : 0.28
SubCost 5 Total : 2,186.80
SubCost 5 Unit Cost : 2,186.80
SubCost 5 Description : Administrative overhead is calculated as 28% of the total surgery cost. The cost includes the facilities, staff, and equipment, associated with the surgery.
SubCost 5 Label : OSR9019A1
SubCost 6 Name : Profit
SubCost 6 Amount : 9,997.000
SubCost 6 Unit : percent
SubCost 6 Price : 0.21
SubCost 6 Total : 2,099.37
SubCost 6 Unit Cost : 2,099.37
SubCost 6 Description : Profit is calculated as 21% of the total surgery cost.
SubCost 6 Label : OSR9019P1
SubCost 7 Name : Tests, X-Rays
SubCost 7 Amount : 1.000
SubCost 7 Unit : set
SubCost 7 Price : 120.00
SubCost 7 Total : 120.00
SubCost 7 Unit Cost : 120.00
SubCost 7 Description : These are standard x-rays of the hip area.
SubCost 7 Label : OSR9019T1
SubCost 8 Name : Laboratory Fees
SubCost 8 Amount : 1.000
SubCost 8 Unit : each
SubCost 8 Price : 10.00
SubCost 8 Total : 10.00
SubCost 8 Unit Cost : 10.00
SubCost 8 Description : Laboratory fees are associated with taking x-rays.
SubCost 8 Label : OSR9019T1.
SubCost 9 Name : Transportation, Taxi
SubCost 9 Amount : 401.000
SubCost 9 Unit : mile
SubCost 9 Price : 301.25
SubCost 9 Total : 800.00
SubCost 9 Unit Cost : 800.00
SubCost 9 Description : These expenses are for hiring a taxi to go shopping and to visit the hospital. Four trips are taken each week for five weeks.
SubCost 9 Label : OSR9019H1

Input : 2007 0SR9019 - Replace Hip Joint with Metal Syn Subs, Cem, Open

Input Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 12,096.67
Total LCC : 12,096.67
Total EAA : 637.09
SubCost 1 Name : Materials, Hip Joint Metal Synthetic Substitute
SubCost 1 Amount : 1.000
SubCost 1 Unit : each
SubCost 1 Price : 880.00
SubCost 1 Total : 880.00
SubCost 1 Unit Cost : 880.00
SubCost 1 Description : This equipment is used to replace hip joints.v220a
SubCost 1 Label : OSR9019M1
SubCost 2 Name : Labor, Physician
SubCost 2 Amount : 2.000
SubCost 2 Unit : hour
SubCost 2 Price : 152.50
SubCost 2 Total : 305.00
SubCost 2 Unit Cost : 305.00
SubCost 2 Description : This labor measures the number of hours that a physician spends preparing for, carrying out the hip replacement surgery, and checking on the patient's recovery.
SubCost 2 Label : OSR9019L1
SubCost 3 Name : Labor, Nurse
SubCost 3 Amount : 3.000
SubCost 3 Unit : hour
SubCost 3 Price : 55.00
SubCost 3 Total : 165.00
SubCost 3 Unit Cost : 165.00
SubCost 3 Description : This labor measures the number of hours that a nurse spends with the patient during the course of their surgery (but not during the course of the patient's fully hospital stay).
SubCost 3 Label : OSR9019L1
SubCost 4 Name : Labor, Anesthesiologist
SubCost 4 Amount : 2.000
SubCost 4 Unit : hour
SubCost 4 Price : 152.50
SubCost 4 Total : 305.00
SubCost 4 Unit Cost : 305.00
SubCost 4 Description : This labor measures the number of hours that an an Anesthesiologist spends administering anesthesia during surgery.
SubCost 4 Label : OSR9019L1
SubCost 5 Name : Drugs, Anesthesia
SubCost 5 Amount : 1.000
SubCost 5 Unit : each
SubCost 5 Price : 165.00
SubCost 5 Total : 165.00
SubCost 5 Unit Cost : 165.00
SubCost 5 Description : This measures the cost of the drug used to anesthetize the patient during surgery.
SubCost 5 Label : OSR9019D1
SubCost 6 Name : Materials, Surgery
SubCost 6 Amount : 1.000
SubCost 6 Unit : each
SubCost 6 Price : 142.00
SubCost 6 Total : 142.00
SubCost 6 Unit Cost : 142.00
SubCost 6 Description : These materials are used in the course of surgery and include tape, bandages, sutures, and others.
SubCost 6 Label : OSR9019M1
SubCost 7 Name : Drugs, Drug 01
SubCost 7 Amount : 3.500
SubCost 7 Unit : day
SubCost 7 Price : 171.00
SubCost 7 Total : 598.50
SubCost 7 Unit Cost : 598.50
SubCost 7 Description : This drug is taken post operation to relieve pain.
SubCost 7 Label : OSR9019D1
SubCost 8 Name : Room, Hospital Stay
SubCost 8 Amount : 3.500
SubCost 8 Unit : day
SubCost 8 Price : 1,500.00
SubCost 8 Total : 5,250.00
SubCost 8 Unit Cost : 5,250.00
SubCost 8 Description : This is the daily charge for staying in the hospital. It covers all expenses.
SubCost 8 Label : OSR9019R1
SubCost 9 Name : Overhead, Administrative
SubCost 9 Amount : 7,810.000
SubCost 9 Unit :
SubCost 9 Price : 0.28
SubCost 9 Total : 2,186.80
SubCost 9 Unit Cost : 2,186.80
SubCost 9 Description : Administrative overhead is calculated as 28% of the total surgery cost. The cost includes the facilities, staff, and equipment, associated with the surgery.
SubCost 9 Label : OSR9019A1
SubCost 10 Name : Profit
SubCost 10 Amount : 9,997.000
SubCost 10 Unit : percent
SubCost 10 Price : 0.21
SubCost 10 Total : 2,099.37
SubCost 10 Unit Cost : 2,099.37
SubCost 10 Description : Profit is calculated as 21% of the total surgery cost.
SubCost 10 Label : OSR9019P1
Unit Amount : 1.00
Unit : each
Total Unit Cost : 12,096.67
Service Life : 20.00
P/C Years : 0.00
Yrs From Base Date : 0.00
Target Type :
Altern Type : accepted
Description : Sample health care treatment cost used in a tutorial. v220a

Input : 2007 0SR9019a- Orthopedic Evaluation

Input Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 440.00
Total LCC : 440.00
Total EAA : 24.38
SubCost 1 Name : Orthopedic Doctor Visit
SubCost 1 Amount : 2.000
SubCost 1 Unit : hour
SubCost 1 Price : 150.00
SubCost 1 Total : 300.00
SubCost 1 Unit Cost : 300.00
SubCost 1 Description : This labor measures the amount of time the physician spends evaluating the patient. The time includes evaluation of the results of patient tests.
SubCost 1 Label : OSR9019L1
SubCost 2 Name : Tests, X-Rays
SubCost 2 Amount : 1.000
SubCost 2 Unit : set
SubCost 2 Price : 120.00
SubCost 2 Total : 120.00
SubCost 2 Unit Cost : 120.00
SubCost 2 Description : These are standard x-rays of the hip area.
SubCost 2 Label : OSR9019T1
SubCost 3 Name : Laboratory Fees
SubCost 3 Amount : 1.000
SubCost 3 Unit : each
SubCost 3 Price : 10.00
SubCost 3 Total : 10.00
SubCost 3 Unit Cost : 10.00
SubCost 3 Description : Laboratory fees are associated with taking x-rays.
SubCost 3 Label : OSR9019T1.
SubCost 4 Name : Materials, General
SubCost 4 Amount : 1.000
SubCost 4 Unit : each
SubCost 4 Price : 10.00
SubCost 4 Total : 10.00
SubCost 4 Unit Cost : 10.00
SubCost 4 Description : These materials include paper dress, room preparation, and sundry materials.
SubCost 4 Label : OSR9019M1
Unit Amount : 1.00
Unit : each
Total Unit Cost : 440.00
Service Life : 20.00
P/C Years : 0.00
Yrs From Base Date : 0.00
Target Type :
Altern Type : notaccepted
Description : Sample health care treatment cost used in a tutorial. v220a

Input : 2007 0SR9019b -Hip Replacement Home Recovery

Input Details

Total OC : 0.00
Total AOH : 0.00
Total CAP : 2,409.00
Total LCC : 2,409.00
Total EAA : 133.50
SubCost 1 Name : Doctor Visits
SubCost 1 Amount : 4.000
SubCost 1 Unit : each
SubCost 1 Price : 150.00
SubCost 1 Total : 600.00
SubCost 1 Unit Cost : 600.00
SubCost 1 Description : This labor covers the amount of time the physician spends on recovery visits with the patient.
SubCost 1 Label : OSR9019L1
SubCost 2 Name : Physical Therapist Visits
SubCost 2 Amount : 4.000
SubCost 2 Unit : each
SubCost 2 Price : 81.00
SubCost 2 Total : 324.00
SubCost 2 Unit Cost : 324.00
SubCost 2 Description : This labor covers the amount of time that a physical therapist spends on recovery visits with the patient. This includes the inpatient hospital stay.
SubCost 2 Label : OSR9019L1
SubCost 3 Name : Labor, Nurse
SubCost 3 Amount : 2.000
SubCost 3 Unit : hour
SubCost 3 Price : 55.00
SubCost 3 Total : 110.00
SubCost 3 Unit Cost : 110.00
SubCost 3 Description : This labor includes answering phone calls, minor check ups, and administrative visits.
SubCost 3 Label : OSR9019L1
SubCost 4 Name : Drugs, Pain Relief, Drug 01
SubCost 4 Amount : 100.000
SubCost 4 Unit : pill
SubCost 4 Price : 5.75
SubCost 4 Total : 575.00
SubCost 4 Unit Cost : 575.00
SubCost 4 Description : This drug, Drug 01, is used for pain relief medicine used by the patient. These are taken three times a day for 4 weeks. And then one time a day for two weeks. The references not that a combination of ibuprofen and anti-inflammatory drugs are used.
SubCost 4 Label : OSR9019D1
SubCost 5 Name : Household, Hip Replace Improvements
SubCost 5 Amount : 1.000
SubCost 5 Unit : each
SubCost 5 Price : 300.00
SubCost 5 Total : 300.00
SubCost 5 Unit Cost : 300.00
SubCost 5 Description : These improvements included installing hand rails in the bathroom, purchasing a walker, and miscellaneous minor repairs.
SubCost 5 Label : OSR9019H1
SubCost 6 Name : Transportation, Taxi
SubCost 6 Amount : 400.000
SubCost 6 Unit : mile
SubCost 6 Price : 1.25
SubCost 6 Total : 500.00
SubCost 6 Unit Cost : 500.00
SubCost 6 Description : These expenses are for hiring a taxi to go shopping and to visit the hospital. Four trips are taken each week for five weeks.
SubCost 6 Label : OSR9019H1
Unit Amount : 1.00
Unit : each
Total Unit Cost : 2,409.00
Service Life : 20.00
P/C Years : 0.00
Yrs From Base Date : 0.00
Target Type :
Altern Type : accepted
Description : Sample health care treatment cost used in a tutorial. v220a

Investment : 0SR9019- Example 2- Replace Hip Joint with Metal Syn Subs, Cem, Open

Dataset: 0SR9019TP- 2007 Exam 2 Hip Replacement Treatment IRI Example 2 of a sample data set used in a health care analysis tutorial.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.